172-65702M-04 (SQ-C01) 10 Dec 2020
1
Introduction
Thank you for purchasing the TLV steam-fired instantaneous water heater,
SteamAqua SQ-C01 (hereafter referred to as "the unit"). The unit is certified by JET
(Japan Electrical Safety & Environment Technology Laboratories) as a water supply
instrument based on the Water Supply Act (in Japan).
The SQ-C01 produces hot water by heating water using steam as a heat source.
The unit does not require electrical wiring and can be used by installing steam and
water piping. However, incorrect handling may cause an unexpected accident. Follow
the instructions to be sure of using the unit properly.
Be sure to read the Instruction Manual and Installation/Piping Installation Procedures
before installing the unit.
Be sure to read the Instruction Manual and "Operational Check/Cleaning Guide"
packed with the unit when carrying out daily operation, maintenance and
troubleshooting.
Be sure to read the Instruction Manual and Maintenance Procedures packed with the
unit before carrying out maintenance and repair work.
Please keep it in a safe place for future reference.
The copyright of this manual belongs to TLV CO., LTD. Unauthorized reproduction of
the contents of this manual in part or in whole is strictly prohibited.
This manual should be kept for future reference. If it becomes defaced or is
misplaced, contact your local TLV representative, or download from the TLV website
(https://www.tlv.com). Membership registration (free of charge) is required to
download the instruction manual.
The contents of this manual are subject to change without notice.
Please note that visuals such as the diagrams and illustrations found within this
manual may differ slightly from the actual unit.
This manual was written for the purpose of use of the unit in the Japanese market.
When the unit is operated by non-Japanese speaking personnel, translate the
instruction manual in their language, explain the contents and implement safety
training before work.
Please carefully read all other documentation included for this unit and its
components.
Make sure that the person supervising operation of the unit has received a thorough
briefing on the contents of the 'Report on Commissioning Results' which is issued
after finishing the commissioning.
Important Notice