
172-65379M-07 (LEX8-TZ) 6 Oct 2021
6
Installation
Install properly and DO NOT use this product outside the recommended
operating pressure, temperature and other specification ranges.
Improper use may result in such hazards as damage to the product or
malfunctions which may lead to serious accidents. Local regulations
may restrict the use of this product to below the conditions quoted.
CAUTION
Take measures to prevent people from coming into direct contact with
product outlets. Failure to do so may result in burns or other injury from
the discharge of fluids.
CAUTION
Installation, inspection, maintenance, repairs, disassembly, adjustment and valve
opening/closing should be carried out only by trained maintenance personnel.
1. Before installing the product, open the inlet valve and blow out the piping to
remove any piping scraps, dirt and oil. Close the inlet valve after blowdown.
2. Before installation, be sure to remove all protective seals.
3. Install the product so the arrow on the body is pointing in the direction of
condensate flow.
4. The product may be installed either horizontally or vertically; there are no
restrictions on the orientation of installation. However, when installing
horizontally, make sure that the product is installed with the temperature adjusting
screw positioned higher than the piping in which the product is installed. (Upside-
down installation is not permissible.)
5. Open the inlet valve gradually and check to make sure that the product functions
properly.
If there is a problem, determine the cause using the “Troubleshooting” section in
this manual.