ENSURE THAT PROPOSED VENT TERMINATION CLEARANCES ARE MET BEFORE ATTEMPTING TO CUT HOLE THROUGH EXTERIOR WALL.
Page 1: ...so as to jeopardize people overheat combustible structures or enter buildings 2 Check vent pipe system for leakage All vent pipe joints on positive side of power venter must be sealed 3 A vent system...
Page 2: ...ith high temperature silicone sealant or metal tape to prevent flue gas leakage TJERNLUND LIMITED ONE YEAR WARRANTY Tjernlund Products Inc warrants to the original purchaser of this product that the p...
Page 3: ...ENSURE THAT PROPOSED VENT TERMINATION CLEARANCES ARE MET BEFORE ATTEMPTING TO CUT HOLE THROUGH EXTERIOR WALL...
Page 4: ...where noted on the template The drill bit must be long enough to penetrate to the building exterior 4 Attach the template to the building exterior aligning the pilot holes on the template with the pil...