NOTE: Do
not
use screws in the dryer duct installation. The LB2 motor can be mounted in
a horizontal or vertical orientation. Discharge must face up if mounted vertically,
(See Diagram C). Do not install the LB2 in an orientation where the sensing tube
port might fill with condensation, (See Diagram B).
1. Considering dryer duct routing and LB2 location, use the (4) #10 x 1 3/4" wood screws to
secure the mounting bracket to the wood structure using the (4) 3/8" holes in the ½ moon
portion of the bracket.
2. Based on the desired mounting orientation, position the mounting bracket onto 3 of the 4
vibration isolators located on the LB2. Tighten the bracket in place using the (3) provided
1/4” nuts. Do not over tighten or damage to rubber mounting isolators may occur.
3. Insert dryer duct on inlet and outlet of LB2 and secure using reinforced foil duct tape.
MOUNTING DRYER BOOSTER NOTIFICATION PANEL (MOUNT IN VISIBLE LOCATION BY CLOTHES DRYER)
IMPORTANT:
The Notification Panel shall be permanently installed within the space in which the clothes dryer is installed. In the case
of a dryer installed in an alcove provided with a door or doors, the Notification Panel shall be installed permanently within the alcove or
immediately adjacent to the doors of the alcove. The Notification Panel shall be located where it will be readily visible after the dryer is
installed without having to open any doors other than those necessary to access the dryer.
NOTE:
The Dryer Duct Booster includes a 50’ control cable. If the distance between the Notification Panel and the Dryer Duct Booster
is greater than the length of the cable, splice a section of 3 conductor PVC sheathed 19 AWG or larger, 105 degree C thermostat cable
to the supplied cable. Make sure the color coded leads remain consistent. An NEC approved accessible junction box and cover must be
used to contain the splice. Splices shall be made mechanically secure and insulated with appropriately sized wire nuts or with a similarly
approved connection method. Strain relief hardware contained within the NEC approved junction box shall be utilized. Do not use an
existing line voltage electrical box to house these low voltage connections. Line voltage to these leads will cause damage to the LB2
control system and may cause personal and/or property damage.
The Notification Panel Terminal Block may be installed in a remodeling or standard electrical box. It may also be installed without an
electrical box.
INSTALLING NOTIFICATION PANEL WITH AN ELECTRICAL BOX
1. Install standard or remodeling single gang electrical box and route control wire from LB2 into electrical box and leave hanging out for
connection to Notification Panel, (See Diagram D).
2. Wire White, Red & Green wires from Dryer Booster cable to Notification Panel terminal block as shown, (See Diagram E)
3. Carefully stuff wires into electrical box and screw Notification Panel terminal block mounting plate to electrical box with Green LED
light on top, (See Diagram F). Adhere Notification Panel label to coverplate and screw coverplate to electrical box with provided
screws, (See Diagram G).
DIAGRAM C
HORIZONTAL
MOUNTING
VERTICAL MOUNTING
MUST DISCHARGE
FACING UP
DIAGRAM D
DIAGRAM F
DIAGRAM G
DIAGRAM E