![Titanium wi-1000 Operating Manual Download Page 13](http://html1.mh-extra.com/html/titanium/wi-1000/wi-1000_operating-manual_1119966013.webp)
11
Capitolo
2.3 Operations
2.3.1 Connecting the electrical power, and press the power switch, Refer fig. 9.
2.3.2 After power on the machine, the power indicator red light will go on
and green light start to flashing, the machine is under heating processing (The
warm up time around 4 mins).
2.3.3 W hen green light is solid on that mean machine is ready to making air
cushion, then press the start / pause button to start.
2.3.4 W hen finish making air cushion, press the start/pause button again, ma
-
chine will stop immediately. There is a perforation line on the film to tear off
the necessary length for your requirement.
2.3.5 Air density setting: Various cushion sizes are available to meet different
packaging requirements, You can use the pressing setting knob to set up the air
density to meet you need. Please adjust the suitable air pressure to get best air
cushion performance. Too much air pressure will result jam or bad air cushion
performance (Remark: “ A” area is suggest for 200mm width film and “ B”
area is suggest for 400mm width film). Refer fig. 10.
2.3.6 if continuous to using the machine, press the start/pause button when
machine indicator is in solid on condition. Pause for more than 30 secs may
cause film within hot rollers in a hot spot break. This is a normal condition as
the hot roller always in a heating process.
2.3.7 if want to power off, please make sure power indicator is in solid on con
-
dition, tear off the film performation line ahead the air nozzle, and push start/
pause button to eject the film completely, and push the start/pause button again
to stop the machine, then you can turn off the power stwitch.