6
STEP 2: INSTALLING GUARD RAILS
1.
Rest
UPRIGHT POST ASSY (3)
on the middle of the
BASE ASSY (1)
and align bolt holes. Insert
CARRIAGE BOLT M10x80 (18)
through the bolt holes from the top and place
FLAT WASHER
M10 (21)
,
SPRING WASHER M10 (22)
and
HEX NUT M10 (23)
onto the end of the bolt. Then
insert
CARRIAGE BOLT M10x60 (20)
through the holes from the side and place
FLAT
WASHER M10 (21)
,
SPRING WASHER M10 (22)
and
HEX NUT M10 (23)
onto the end of the
bolt.
FASTEN BUT DO NOT TIGHTEN HARDWARE.
2.
Repeat the above procedures for mounting the second
UPRIGHT POST ASSY (3)
onto the
BASE ASSY (1)
.
3.
Attach
CENTER GUARD RAIL (15)
to the center of
CORNER FRAME-1 (4)
and
CORNER
FRAME-2 (5)
respectively using
CARRIAGE BOLT M10x60 (20)
,
FLAT WASHER M10 (21)
,
SPRING WASHER M10 (22)
and
HEX NUT M10 (23)
. The order of assembly is to push
CARRIAGE BOLT M10x60 (20)
through the holes and then place
FLAT WASHER M10 (21)
,
SPRING WASHER M10 (22)
and
HEX NUT M10 (23)
onto the end of the bolt.
FASTEN BUT DO NOT TIGHTEN HARDWARE.
4.
Attach
CENTER GUARD RAIL (15)
to the center of
UPRIGHT POST ASSY (3)
using
RAIL
MOUNTING PLATE – 1 (7)
,
CARRIAGE BOLT M10x70 (17)
,
FLAT WASHER M10 (21)
,
SPRING
WASHER M10 (22)
and
HEX NUT M10 (23)
. Repeat the above procedures for mounting the
second
CENTER GUARD RAIL (15)
on the other face.
5.
Attach the 2 ends of TOP
GUARD RAIL (2)
to using
CORNER FRAME-1 (4)
and
CORNER
FRAME-2 (5)
respectively using
CARRIAGE BOLT M10x60 (20)
,
FLAT WASHER M10 (21)
,
SPRING WASHER M10 (22)
and
HEX NUT M10 (23)
.
6.
Attach the center of
TOP GUARD RAIL (2)
to the center of
UPRIGHT POST ASSY (3)
using
RAIL MOUNTING PLATE -2 (14)
,
CARRIAGE BOLT M10x65 (19)
,
FLAT WASHER M10 (21)
,
SPRING WASHER M10 (22)
and
HEX NUT M10 (23)
. Repeat the above procedures for
mounting the second
TOP GUARD RAIL (2)
on the other face.
Summary of Contents for 190502
Page 13: ...13 PARTS DIAGRAM EXPLODED VIEW...