16 AUIA.123.00.00.00.00-05 OM
ХТ4/1
- MGA
EXIT
Not applicable
1) type of output –
open collector;
2) peak voltage on
privacy key 50V;
3) peak current of
public key 9A;
4) resistance of public
key 0,11Ohm
ХТ4/3
- MGB
EXIT
ХТ4/2
+ MGA
Not applicable
ХТ4/4
+ MGB
ХТ5/1
GND (common)
ХТ5/2
GND (common)
ХТ5/3
GND (common)
ХТ5/4
+ 12V
1) power supply
voltage 12V;
2) consumption current
< 150mA
ХТ5/5
+ 12V
ХТ5/6
+ 12V
2 INTENDED USE
2.1 Operation limitations
2.1.1 The turnstile must be used in the environment specified in the p. 1.1.4 of this document subject to
the specifications listed in the section 1.2.
2.1.2
IT IS PROHIBITED:
1)
UNINTENDED USE OF THE TURNSTIL
(see the section 1 «DESCRIPTION AND
OPERATION»);
2)
TO USE THE TURNSTILE UNEARTHED
;
3)
TO USE HEATING PIPES AND RADIATIONS AS WELL AS PIPES OF CENTRAL
WATER SUPPLY FOR EARTHING
;
4)
TO REPAIR AND ADJUST WITHOUT DEENERGIZING
;
5)
TO RELOCATE THE OBJECTS EXCEEDING THE PASSAGEWAY WIDTH THROUGH
THE TURNSTILE ACCESS AREA;
6)
TO JERK AND IMPACT ON BLADES OR OTHER PARTS THE PRODUCT, WHICH
MAY CAUSE THEIR MECHANICAL DEFORMATION OR DAMAGE.
2.1.3 It is not allowed to use the turnstile:
–
at the presence of mechanical rattle in movable parts of the turnstile;
–
when metalwork of the turnstile and its components and accessories are mechanically damaged.
2.1.4
List of special conditions of operation
Mean time of the turnstile access (in single access mode) equals to 3 sec.
The force applied by accessor to barrier rod should not exceed 60Н.
For augmentation of the turnstile’s traffic flow capacity in case of emergency escape door or gate
can be installed near the turnstile.
ATTENTION: MANUFACTURER WARNS OF NECESSITY TO KEEP SEALS OF
THE MANUFACTURER ON THE TURNSTILE’S COMPONENT PARTS!
2.2 Layout and installation
2.2.1 The turnstile and components of delivery kit are delivered to the installation site in the factory
packing. The turnstile should be unpacked only on installation site.
2.2.2 Preparation of the turnstile for installation (dismounting) and commissioning should be
performed according to this OM with mandatory observation of the safety measures specified in p.
2.1 and general electrical safety code.