Stage
2
Bed Assembly - Use Pack 'B'
D
x1
1
3
A
x16
B
C
K
x4
8
Page 5 of 9
.
&
4
90%
Make certain the bed is squared
up as shown in the diagram then
tighten all bed assembly bolts 100%.
B C
6
Page 1: ...that the packaging is disposed of in a safe environmentally friendly way CAUTION There are small components used in the construction of this unit These loose items should be kept away from young child...
Page 2: ...tting metal slat frame 4 metal connection plate M to Nuts for M8 slat frame bolts Flange Lock Nuts M8 for gas lift pistons J a Gas Lift Mechanisms x1 x1 J b Spring Washers for M8 bolts B A x8 Bolts M8...
Page 3: ...a J b PLEASE CAREFULLY FOLLOW THE DIAGRAM BELOW LIFT FROM LEFT Fitting Gas Lift Mechanisms Use Pack A B Stage J b B A C D J a 1 2 R F I T H E R E L F I T H E R E R F I T H E R E R F I T H E R E BLUE R...
Page 4: ...TH LIFT MECHANISMS TO LEFT SIDE OF THE BED BOLT INTO THE HOLES MARKED L WITH RED LABELS THE MECHANISMS ARE LABELED J a J b PLEASE CAREFULLY FOLLOW THE DIAGRAM BELOW LIFT FROM RIGHT Fitting Gas Lift Me...
Page 5: ...sembly Use Pack B D x1 1 2 3 3 A x16 B x16 C x16 D x1 K x4 Stage 3 K 3 8 8 Page 5 of 9 1 2 3 4 D 90 Make certain the bed is squared up as shown in the diagram then tighten all bed assembly bolts 100 A...
Page 6: ...the bed on its side and using the velcro tape attach the Fabric Base Cover 7 carefully to the bottom of the side panels headboard footboard Make sure fabric is fitted evenly all round Fitting Slat Fra...
Page 7: ...HOLD THEM FORWARD Slat Frame Support Bar 1 2 Fitting Slat Frame Page 7 of 9 Stage 6...
Page 8: ...D x1 ii Using two bolt sets on each side E C B F loosely fix slat frame to six holes finger tight Bolt into centre of long holes i With help lift Slat Frame 4 onto slat frame support bars 10mm Hold f...
Page 9: ...hen slowly push down metal frame ensuring the frame is aligned with the side panels Depending on the weight of the mattress the speed of the lift will vary so be careful until you get used to the spee...