background image

Type of oil

Oil quantity mark

Moebius A

NORMAL QUANTITY
SUFFICIENT QUANTITY

2.Oiling spot

Hammer

There must be oil within the range of the arrow. 

Lower plate for chronograph bridge

Note

Switch spring
*Oiling spot and spring setting position.

Chronograph coupling lever

Hammer operation lever B

Setting position

Switch spring

TECHNICAL  GUIDE

Version-01

VK Series

16

*1

: Oiling should be done on the pointed

     spot of marked place.

*Oiling should be done on the contact spot of the spring and the pin.

SII Products

9

21

28

16

19

20

*1

*1

*1

*1

*2

*3

*2

*3

Summary of Contents for Cal.VK Series

Page 1: ...SII Products ANALOGUE QUARTZ TECHNICAL GUIDE PARTS CATALOGUE Cal VK Series Issued on 05 Jan 2011...

Page 2: ...m O O O 60 second per round O O O 60 second per round Casing diameter Movement Movement size VK63 SII Products PARTS CATALOGUE TECHNICAL GUIDE Cal No Item Cal VK Series VK67 VK83 Total height Version...

Page 3: ...ndicator maintaining plate Date dial 0810 019 Date jumper 0806 002 Date corrector wheel 2 1 7 2 3 Cross section Refer to page 7 for each parts code Refer to page 7 for each parts code Refer to page 7...

Page 4: ...0837 005 Switch lever holder 4450 017 Switch lever A 4450 018 Switch lever B 0962 891 0962 013 SII Products 3 Version 01 VK Series PARTS CATALOGUE 8 9 10 11 12 14 Date corrector setting transmission...

Page 5: ...0894 002 Train wheel stop lever 0888 017 0587 004 Hammer operating lever A 23 Hammer operation lever B Refer to page 7 for each parts code 20 22 25 Second counting wheel 19 21 Refer to page 7 for eac...

Page 6: ...e for chronograph bridge screw 33 Minute counter intermediate wheel and pinion C 34 Minute counter intermediate wheel and pinion B 0886 007 Cal VK63 VK83 0886 006 Cal VK63 VK83 33 Hour counter interme...

Page 7: ...42 Coil block B 4146 063 Step rotor 0221 087 4239 064 Stator B 0383 891 0701 015 0384 024 Yoke 0240 018 Second wheel 0282 452 Clutch wheel 0962 012 0351 177 Winding stem 6 PARTS CATALOGUE Version 01 V...

Page 8: ...hour hand wheel and pinion O Intermediate date wheel and pinion 7 O O O 0802 039 0685 002 0157 012 Small hour hand wheel Date indicator driving wheel 23 O O Positioning arbor O 0902 011 Minute counti...

Page 9: ...l and pinion 37 36 34 34 36 38 Counter intermediate wheel and pinion Nil 8 SII Products 36 G 33 Nil E F Hour counter intermediate wheel and pinion A 33 34 36 Counter intermediate wheel and pinion 35 A...

Page 10: ...raph bridge Note Switch spring Oiling spot and spring setting position Chronograph coupling lever Hammer operation lever B Setting position Switch spring TECHNICAL GUIDE Version 01 VK Series 16 1 Oili...

Page 11: ...osition Switch spring Switch spring Switch lever B Switch lever A Hammer operation lever A Chronograph coupling lever Switch lever B is set between the switch spring and hammer operation lever A Switc...

Page 12: ...ch spring s battery clamp catch the main plate Switch spring Battery clamp 1 When Removing Main plate 2 When Installing 7 Remarks on installing the battery 1 After the battery is replaced with a new o...

Page 13: ...hour hand pull out the crown to the second click position and rotate it clockwise until changed to the next date then install the 24 hour hand 9 How to check correct hands attachment The hand s top su...

Page 14: ...utton B for two seconds and release the button 3 Push the crown back to the normal position 4 The small second hand will move at two second interval for 10 seconds If the crown is operated within this...

Page 15: ...63 and VK67 Cal VK83 The chronograph can measure up to 20 minutes The chronograph stops after a measurement for 20 minutes Restart in the following procedure Cal VK63 67 83 in common During the chrono...

Reviews: