Timbertech RadianceRail Installation Manual Download Page 3

4

   Attach Hinges to Aluminum Side Rails

gate opening, determine the desired hinge location.  Hinges can be placed either in 

the open position when the gate is closed or in the closed position when the gate is closed (typical for a door).

  Drill 7/64” pilot holes and use 3/16” x 1” self-drilling screws to attach hinges to the aluminum Side Rails. 

5

   Attach Gate to Post

  After positioning the gate to the desired height, pre-drill the Post Cover using a 7/64” drill bit.  Attach the gate to the 

post using the 3/16” x 2” flat head screws, installing the screws closer to the center of the post first.

  Install Tip: Add temporary support blocking under the gate to help hold the gate at correct height.

6

   Attach Latch and Latch Stop

  Position the gate latch on the Post Cover. Pre-drill the Post Cover with a 7/64” drill bit.  Install the Latch with the Latch lever 

up, using the provided screws.  Position the Latch Stop on the aluminum Side Rail.  Drill a pilot hole in the Side Rail with a 

7/64” drill bit.  Attach the Latch Stop using the 3/16” x ¾” self drilling screws.

Installing a Gate: Continued

3/16” x 1” Self Drilling 
Screws (black)

Hinge

Temporary Support Blocks

Reviews: