![Timberline Tool TR50-CTS Instruction Manual Download Page 3](http://html1.mh-extra.com/html/timberline-tool/tr50-cts/tr50-cts_instruction-manual_1116797003.webp)
A1
B2
B3
B1
B2
D2
D2
D1
C1
A4
C4
A2
C2
C3
C5
Detail A
Tool Open
Detail C
Tool Closed
Detail B
Tool Open
Detail D
Tool Closed
C
A
D
B
OPERATING INSTRUCTION
1. Ensure the lever (A1) is in the down po
are fully open.
2. Lower the tool onto the pipe until the c
the top of the pipe. Try to keep the too
squeeze-off.
3. With the centering cable (B3) resting o
outer tube (A2) with one hand and the
Firmly rotate the lever (A1) upward unt
(C1). This will be evident by the top of
(D1). The pipe should now be squeez
4. To prevent the accidental release of th
through the hole in the inner tube (C3)
5. When it is safe to remove the tool, rem
inner tube and rotate the lever downwa
the pipe.
Familiarize yourself with all parts, names, and numbers. Refer to this
diagram for the assembly and operation procedures that follow.
TR50CTS DIAGRAM
Detail A
•
A1 – Lever
•
A2 – Outer Tube
•
A4 – Brass Top Cap
Detail B
• B1
–
Yoke
•
B2 – Jaws
•
B3 – Centering Cable
Detail C
•
C1 – Lever
•
C2 – Outer Tube
•
C3 – Inner Tube
•
C4 – Brass Top Cap
•
C5 – Safety Pin
Detail D
• D1
–
Yoke
•
D2 – Jaws
TIM
© 2008 Timberline Tool All Rights Reserved.
4