2
M10 x 20 mm
FIG 2
FIG 3
Bottom Half
Bell
Stand
Top Half
Bell
Stand
Fire Sculpture Assembly and Installation (cont’d):
• Fasten the Bottom Half Bell stand to the Top Half
Bell stand using the M10 x 20 mm Phillips/Hex Head
Bolt supplied (E). Thread the Bolt (M10 x 20 mm)
through the Bottom Half Bell stand to fasten the two
sections of the Fire Sculpture together with a Phillips
screwdriver (see FIG 2).
• Upright the Fire Sculpture. Add the Fuel Canister and
Snuffer to complete assembly. Place Decorative Black
Rocks in the tray around the fuel canister (see FIG 3).