12. Remove distribution cassette towards the back by pulling on
the mounting pin (located on the far side behind the cassette).
13. Make all required fusion splices inside
distribution cassettes.
14. Store distribution cable tubes on provided
management clips. Mount distribution cassette back
and secure in place with push pin.
11. Bring all fiber tubes out thru right side door.