background image

Tigo Energy, Inc. 420 Blossom Hill Rd, Los Gatos, California 95032 USA | www.tigoenergy.com

P: +1.408.402.0802 F: +1.408.358.6279 | [email protected]

1

2

3

1

2

3

4

Position  the  cover  on  top  of  the  base  with  the  seven
clips lined up as shown.

TS4 Key Guide – Cover Installation

Lock the clips on the top and bottom first, then the sides.

The clips should close and lock with an audible click.

Apply light pressure in the middle of the cover to line up
the internal electrical connections.

Insert the jaws of the TS4 key into the outer part of the
clip and pull towards the middle of the cover as shown
without exerting force on the module.

www.tigoenergy.com/ts4key

All  personnel  installing  or  removing  TS4  covers  should
complete the TS4 key certification course available at:

TS4 Key

1. 

Jaws for securing cover to base

2. 

Clip opener

3. 

Cover separator

P/N 002-00043-00 Rev.1.1

Contact

Support.tigoenergy.com

[email protected]

International: 00800.2255.8446

Americas: +1.408.402.0802 #2

Reviews: