background image

PLEASE READ THIS FIRST

IMPORTANT SAFETY INSTRUCTIONS 
SAVE THESE INSTRUCTIONS 

LETHAL VOLTAGE MAY BE PRESENT IN ANY PV INSTALLATION

•  This manual contains important instructions for installation and 

maintenance of the Tigo Energy® product models MM-ES-

050V300W, MM-ES075V350W, MM-ES110V300W, MM-ES-

170V300W, MM-2ES050V300W, MM-2ES075V350W, MMJ-

ES050V300W, HBF-ES050300W, ES-GTWY-020, MMU-ES, 

and related Tigo Energy software applications.

•  Risk of electric shock, do not remove cover, disassemble, or 

repair, no user serviceable parts inside. Refer servicing to quali-

fied service personnel.

•  Before installing or using the Tigo Energy® Maximizer™ Sys-

tem, please read all instructions and warning markings on the 

Tigo Energy products, appropriate sections of your inverter 

manual, photovoltaic (PV) module installation manual, and other 

available safety guides.

•  Failure to adhere to these instructions may result in injury or 

death, damage to the system or voiding the factory warranty.

•  To reduce risk of fire and shock hazard, install this device with 

strict adherence to National Electric Code (NEC) ANSI/NFPA 

70 and/or local electrical codes. When the photovoltaic array is 

exposed to light, it supplies a DC voltage to the Tigo Energy® 

Module Maximizer™. The Module Maximizer starts in the “ON” 

state and its output voltage may be as high as the PV module 

open circuit voltage (Voc) when connected to the module. The 

installer should use the same caution when handling electrical 

cables from a PV module with or without the Tigo Energy Mod-

ule Maximizer attached. 

•  Installation must be performed by trained professionals only. 

Tigo Energy does not assume liability for loss or damage result-

ing from improper handling, installation, or misuse of products. 

•  Remove all metallic jewelry prior to installing the Tigo Energy 

Module Maximizer to reduce the risk of contacting live circuitry. 

Do not attempt to install in inclement weather. 

•  Do not operate the Tigo Energy Module Maximizer if it has 

been physically damaged. Check existing cables and connec-

tors, ensuring they are in good condition and appropriate in 

rating. Do not operate the Tigo Energy Module Maximizer with 

damaged or substandard wiring or connectors. Tigo Energy 

Module Maximizer must be mounted on the high end of the PV 

module back-sheet or racking system, and in any case above 

ground.

•  Do not connect or disconnect under load. Turning off the 

Inverter and/or the Tigo Energy products may not reduce this 

risk. Internal capacitors within the inverter can remain charged 

for several minutes after disconnecting all power sources. 

Verify capacitors have discharged by measuring voltage across 

inverter terminals prior to disconnecting wiring if service is re-

quired.

•  Service Personnel: Check the voltage of the array after activat-

ing the Tigo Energy® PV-Safe™ function on the MMU prior to 

performing service.

•  Always assume Module Maximizer is in “ON” state, or may turn 

on when restarting.

Summary of Contents for ENERGY MODULE MAXIMIZER 2ES Series

Page 1: ...s CA 95032 USA 1 888 609 TIGO 8446 Customer support line toll free in USA 1 888 681 TIGO 8446 Customer support fax toll free in USA 800 CALL TIGO 2255 8446 Customer support line in Europe 1 408 358 62...

Page 2: ...n connected to the module The installer should use the same caution when handling electrical cables from a PV module with or without the Tigo Energy Mod ule Maximizer attached Installation must be per...

Page 3: ...apping 5 Configuring the System Online 6 Installing Maximizers 7 Initiating Discovery 8 Connecting Modbus Accessories optional Map For troubleshooting and additional information see our website www ti...

Page 4: ...GTWY Management Unit Internet 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 SYSTEM OVERVIEW SYSTEM GUIDELINES 1 MMU Up to 7 GTWY and 360 PV modules 1 GTWY Up to 120 PV modules Optimizer 1 MM ES per 1 PV mo...

Page 5: ...see more in 3 Installing GTWYs 8 05 20 5cm 8 01 20 6cm 8 7 22 1cm 7 36 18 7cm Inverter Ethernet 3 Connections GTWY Cable 2 INSTALLLING MANAGEMENT UNIT MMU DONE Perform Network Test 3 2 on MMU menu WH...

Page 6: ...istor first 1 2 3 4 5 6 7 18 0 82 2604 793 2604 793 1817 553 1363 415 1090 332 908 276 716 218 20 0 52 2604 793 1714 522 1143 348 857 261 686 209 571 174 456 138 22 0 33 2156 657 1078 328 719 219 539...

Page 7: ...aximizer MAC ID MAC ID 1 21 2 22 3 23 4 24 5 25 6 26 7 27 8 28 9 29 10 30 11 31 12 32 13 33 14 34 15 35 16 36 17 37 18 38 19 39 20 40 MMU ID Site Name Unit Name Unit Name Gateway ID Need help Call us...

Page 8: ...5 CONFIGURING SYSTEM ONLINE Option 1 Option 2 https installations tigoenergy com 1 2 2 3 Follow wizard instructions New User Returning User Click on...

Page 9: ...be connected to the first panel of each pair MAC ID MAC ID 1 21 2 22 3 23 4 24 5 25 6 26 7 27 8 28 9 29 10 30 11 31 12 32 13 33 14 34 15 35 16 36 17 37 18 38 19 39 20 40 MMU ID Site Name Unit Name Uni...

Page 10: ...iscov ery one by one ensuring that GTWY discovery is complete before moving to the next MMU This may take several minutes to several hours depending on the size of the system 2 1 DISCOVERY MENU ENTER...

Page 11: ...essories Terminal AC meter or inverter installation manual GND N A DATA DATA To GTWY Modbus Device A Modbus Device B Series connection for multiple similar devices TIGO ENERGY SUPPORT 1 888 609 TIGO 8...

Page 12: ...cepts female or keying Do not connect any other type Environmental Specifications Operating tempera ture ES 2ES GTWY 30 C to 70 C 22 F to 158 F Operating tempera ture J ES 40 C to 85 C 40 F to 185 F O...

Reviews: