
Please retain instructions for future reference
07
Step 2:
FLOOR ASSEMBLY
(CHECK WHAT SIZE YOU HAVE AND THE MODULES SUPPLIED)
• Place half logs as shown.
• Secure to tanalised floor bearer through notch at end using 1x S40 per notch.
(Detail B)
• Using a utility knife or similar, cut a slight notch in the top tongue of each half log and screw through log into
tanalised floor bearer using 1x S80 per cut notch.
(Detail C)
C
B
S40
S40
S40
S80
TOP TONGUE
Summary of Contents for TIGERFLEX Copia
Page 1: ...TIGERFLEX APEX LOGCABIN GENERAL ASSEMBLY INSTRUCTIONS TIG INS38...
Page 11: ...11 Please retain instructions for future reference B Q B D Q A B D...
Page 13: ...13 Please retain instructions for future reference B Q A D Q D B B...
Page 31: ...31 Please retain instructions for future reference...