MAINTENANCE
Boom
Maintenance Section 4-28
©2020 Alamo Group Inc.
MAINTENANCE
Boom Cylinder Removal and Replacement Instructions
1.
Clear the area of all personnel before lowering the boom mower head.
2.
From the tractor seat with your seat belt fastened around you, lower the boom mower head to the
ground. Extend the boom to the furthest reach and lower the mower head flat on the ground. DO NOT
attempt to replace the cylinders with the boom in the raised or transport position.
3.
Shut off the tractor, engage the parking brake, place the tractor transmission in the park position, and
remove the key before dismounting.
4.
Allow the system to cool to room temperature before removing any hydraulic components
5.
Wear safety glasses and impenetrable gloves when working with hydraulic hoses and fittings.
6.
Release all oil pressure from the hydraulic circuit by manually stroking each valve section with the trac-
tor engine off. Utilize the manual override function if the unit is equipped with an electric over hydraulic
valve.
7.
Utilize blocks, jack stands or a suitable over head hoist to support the weight of the boom section and
remove pressure form the cylinder mounting pins.
8.
Check to see that the cylinder to be replaced is not under pressure by moving the cylinder pins by
hand. The pins should be loose and should slide from the pin bore easily. If the pins are tight and can-
not be moved, the cylinder may be under pressure. Make sure the boom components are properly sup-
ported and that the pressure is relived from the circuit.
9.
Cylinder assemblies are heavy and can fall when the pins are removed. Support the hydraulic cylinder
with a suitable hoist or jack.
10.
Slowly loosen the hydraulic connections to the cylinder. Carefully unscrew hose fitting and allow any
remaining pressure to bleed off.
Use extreme care.
Oil must be cool, and the technician should stand
to the side to prevent exposure to any hydraulic oil. Always consult the Material Safety Data Sheet and
wear any required Personal Protective Equipment. A catch pan may be required to retain any spilled
oil.
11.
Cap both ends of the fitting with suitably sized metal caps.
12.
Remove the cylinder pins starting with the ROD end cylinder pin. Make sure the cylinder is properly
supported, and remove the base end cylinder pin. The cylinder may be heavy-- use proper lifting tech-
niques to lift and handle the cylinder. If needed, get assistance from another person to safely lift the cyl-
inder from the machine.
13.
Measure the distance between the cylinder pin holes and extend the new cylinder the correct length
prior to attempting an installation.
14.
Install the new cylinder in place and install both cylinder pins and retaining hardware.
15.
Remove the metal caps and re-install the hydraulic hoses.
16.
Check the hydraulic reservoir of the boom mower to ensure there is sufficient oil. Follow the manufac-
tures recommendations for proper oil type and filtering techniques and requirements to add oil to the
system.
17.
Clear the area of all persons prior to starting the tractor.
18.
Consult the Operator's Manual for instructions in regard to the proper operating procedure.
19.
From the tractor seat, with the seat belt fastened, operate the boom to ensure proper operation of the
boom function.
20.
From the tractor seat, with the seat belt fastened, operate the boom controls to fully extend and retract
the new cylinder several times to purge any trapped air from the system.
21.
From the tractor seat, with the seat belt fastened, look for signs of an oil leak. If an oil leak is observed,
shut the tractor down and follow the steps to remove pressure from the hydraulic circuit. Identify the
source of the leak and resolve the issue.
22.
Upon completion of the required repairs return to Step # 16 to recheck the cylinder for proper opera-
tion.
Summary of Contents for M110GX
Page 4: ......
Page 6: ......
Page 7: ...Bengal Boom Safety Section 1 1 SAFETY SAFETY SECTION...
Page 29: ...Bengal Boom Safety Section 1 23 SAFETY 34852 HYDRAULIC TANK TB1011 MOWER DECK...
Page 32: ...Bengal Boom Safety Section 1 26 SAFETY...
Page 33: ...VVHPEO 6HFWLRQ 66 0 6 7 21 8 0 1...
Page 45: ...66 0 VVHPEO 6HFWLRQ 7521 7 9 9 32576 ASM C 0089...
Page 49: ...66 0 VVHPEO 6HFWLRQ 220 2 67 5 0 ASM C 0082A...
Page 60: ...66 0 VVHPEO 6HFWLRQ...
Page 61: ...2SHUDWLRQ 6HFWLRQ 2013 Alamo Group Inc 23 5 7 21 6 7 21...
Page 82: ...23 5 7 21 RRP 2SHUDWLRQ 6HFWLRQ 2013 Alamo Group Inc 23 5 7 21 9 5 220 6 9 9 5 220 6...
Page 106: ...23 5 7 21 RRP 2SHUDWLRQ 6HFWLRQ 2013 Alamo Group Inc 23 5 7 21...
Page 107: ...Maintenance Section 4 1 2020 Alamo Group Inc MAINTENANCE SECTION...
Page 114: ...MAINTENANCE Boom Maintenance Section 4 8 2020 Alamo Group Inc MAINTENANCE...
Page 136: ...MAINTENANCE Boom Maintenance Section 4 30 2020 Alamo Group Inc MAINTENANCE...
Page 139: ...PARTS SECTION KUB M110GX BENGAL BOOM...
Page 141: ...PARTS ORDERING GUIDE ODPR URXS QF 3DUWV 6HFWLRQ 8 0 1...
Page 142: ...BOOM MOUNT KIT SIDE STOW 2013 Alamo Group Inc Parts Section 5 4 KUB M110GX BENGAL...
Page 144: ...BOOM MOUNT KIT 3 POINT STOW OPEN STOW 2013 Alamo Group Inc Parts Section 5 6 KUB M110GX BENGAL...
Page 146: ...TRACTOR MOUNT KIT 2013 Alamo Group Inc Parts Section 5 8 KUB M110GX BENGAL...
Page 148: ...TRACTOR MOUNT KIT HYDRAULICS 2013 Alamo Group Inc Parts Section 5 10 KUB M110GX BENGAL...
Page 150: ...AXLE BRACE ASSEMBLY 2013 Alamo Group Inc Parts Section 5 12 KUB M110GX BENGAL...
Page 152: ...SINGLE COLUMN BOOMREST 2013 Alamo Group Inc Parts Section 5 14 KUB M110GX BENGAL...
Page 154: ...4 SPOOL CABLE CONTROL MOUNT 2013 Alamo Group Inc Parts Section 5 16 KUB M110GX BENGAL...
Page 156: ...CABLE MANUAL LIFT VALVE 4 SPOOL 2013 Alamo Group Inc Parts Section 5 18 KUB M110GX BENGAL...
Page 158: ...5 SPOOL CABLE CONTROL MOUNT 2013 Alamo Group Inc Parts Section 5 20 KUB M110GX BENGAL...
Page 160: ...CABLE MANUAL LIFT VALVE 5 SPOOL 2013 Alamo Group Inc Parts Section 5 22 KUB M110GX BENGAL...
Page 162: ...JOYSTICK AND SWITCH BOX MOUNT 2013 Alamo Group Inc Parts Section 5 24 KUB M110GX BENGAL...
Page 164: ...ELECTRONIC PROPORTIONAL LIFT VALVE 2013 Alamo Group Inc Parts Section 5 26 KUB M110GX BENGAL...
Page 174: ...POLYCARBONATE SAFETY WINDOW 2013 Alamo Group Inc Parts Section 5 36 KUB M110GX BENGAL...
Page 178: ...NOTES 2013 Alamo Group Inc Parts Section 5 40 KUB M110GX BENGAL...
Page 179: ...PARTS SECTION COMMON BENGAL BOOM...
Page 180: ......
Page 183: ...PART NAME INDEX WETCUT CABLES 116 2014 Alamo Group Inc Parts Section 6 4 COMMON BENGAL...
Page 184: ...PARTS ORDERING GUIDE 2014 Alamo Group Inc Parts Section 6 4 COMMON BENGAL...
Page 186: ...BOOM ASSY BENGAL 18 2014 Alamo Group Inc Parts Section 6 6 COMMON BENGAL...
Page 188: ...BOOM ASSY BENGAL 22 SIDE STOW 2014 Alamo Group Inc Parts Section 6 8 COMMON BENGAL...
Page 190: ...BOOM HYD ASSY BENGAL 22 SIDE STOW 2014 Alamo Group Inc Parts Section 6 10 COMMON BENGAL...
Page 192: ...BOOM ASSY BENGAL 22 OPEN STOW 3PS 2014 Alamo Group Inc Parts Section 6 12 COMMON BENGAL...
Page 194: ...BOOM HYD ASSY BENGAL 22 OPEN STOW 3PS 2014 Alamo Group Inc Parts Section 6 14 COMMON BENGAL...
Page 196: ...BOOM ASSY BENGAL 24 SIDE STOW 2014 Alamo Group Inc Parts Section 6 16 COMMON BENGAL...
Page 198: ...BOOM HYD ASSY BENGAL 24 SIDE STOW 2014 Alamo Group Inc Parts Section 6 18 COMMON BENGAL...
Page 200: ...BOOM ASSY BENGAL 24 OPEN STOW 2014 Alamo Group Inc Parts Section 6 20 COMMON BENGAL...
Page 202: ...BOOM HYD ASSY BENGAL 24 OPEN STOW 3PS 2014 Alamo Group Inc Parts Section 6 22 COMMON BENGAL...
Page 207: ...NOTES 1 2014 Alamo Group Inc Parts Section 6 27 COMMON BENGAL...
Page 216: ...ROTARY MOWER SPINDLE ASSEMBLY 2014 Alamo Group Inc Parts Section 6 36 COMMON BENGAL...
Page 218: ...BOOM ROTARY PIVOT ASSEMBLY 2014 Alamo Group Inc Parts Section 6 38 COMMON BENGAL...
Page 220: ...50IN FLAIL DRIVE ASSEMBLY 2014 Alamo Group Inc Parts Section 6 40 COMMON BENGAL...
Page 226: ...63IN FLAIL DRIVE ASSEMBLY 2014 Alamo Group Inc Parts Section 6 46 COMMON BENGAL...
Page 228: ...63IN FLAIL MOWER ASSEMBLY 2014 Alamo Group Inc Parts Section 6 48 COMMON BENGAL...
Page 230: ...BOOM FLAIL PIVOT ASSEMBLY 2014 Alamo Group Inc Parts Section 6 50 COMMON BENGAL...
Page 239: ...NOTES 2014 Alamo Group Inc Parts Section 6 59 COMMON BENGAL...
Page 244: ...FRONT HYDRAULIC PUMP 2014 Alamo Group Inc Parts Section 6 64 COMMON BENGAL...
Page 246: ...50IN AND 60IN ROTARY MOTOR BREAKDOWN 2014 Alamo Group Inc Parts Section 6 66 COMMON BENGAL...
Page 248: ...50IN AND 63IN FLAIL MOTOR BREAKDOWN 2014 Alamo Group Inc Parts Section 6 68 COMMON BENGAL...
Page 250: ...COOLER ASSEMBLY 2014 Alamo Group Inc Parts Section 6 70 COMMON BENGAL...
Page 256: ...MANUAL LIFT VALVE SCHEMATIC 2014 Alamo Group Inc Parts Section 6 76 COMMON BENGAL...
Page 258: ...ELECTRONIC LIFT VALVE SCHEMATIC 2014 Alamo Group Inc Parts Section 6 78 COMMON BENGAL...
Page 261: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2014 Alamo Group Inc Parts Section 6 81 COMMON BENGAL...
Page 262: ...ELECTRICAL TROUBLESHOOTING GUIDE 2014 Alamo Group Inc Parts Section 6 82 COMMON BENGAL...
Page 263: ...HYDRAULIC TROUBLESHOOTING GUIDE 2014 Alamo Group Inc Parts Section 6 83 COMMON BENGAL...
Page 264: ...TROUBLESHOOTING 2014 Alamo Group Inc Parts Section 6 84 COMMON BENGAL...
Page 265: ...TROUBLESHOOTING CONTINUED 2014 Alamo Group Inc Parts Section 6 85 COMMON BENGAL...
Page 267: ...CLEAN CUTTER HEAD 2014 Alamo Group Inc Parts Section 6 87 COMMON BENGAL...
Page 268: ...CLEAN CUTTER ASSEMBLY 2014 Alamo Group Inc Parts Section 6 88 COMMON BENGAL...
Page 269: ...CLEAN CUTTER OPERATION 2014 Alamo Group Inc Parts Section 6 89 COMMON BENGAL...
Page 270: ...CLEAN CUTTER OPERATION CONTINUED 2014 Alamo Group Inc Parts Section 6 90 COMMON BENGAL...
Page 271: ...CLEAN CUTTER MAINTENANCE 2014 Alamo Group Inc Parts Section 6 91 COMMON BENGAL...
Page 273: ...CARBIDE TIP REPLACEMENT 2014 Alamo Group Inc Parts Section 6 93 COMMON BENGAL...
Page 274: ...NOTES 3 2014 Alamo Group Inc Parts Section 6 94 COMMON BENGAL...
Page 275: ...FIRE SUPPRESSION SYSTEM 2014 Alamo Group Inc Parts Section 6 95 COMMON BENGAL...
Page 276: ...FIRE SUPPRESSION 3 POUNT MOUNT 2014 Alamo Group Inc Parts Section 6 96 COMMON BENGAL...
Page 278: ...FIRE SUPPRESSION FRONT MOUNT 2014 Alamo Group Inc Parts Section 6 98 COMMON BENGAL...
Page 281: ...WETCUT 2014 Alamo Group Inc Parts Section 6 101 COMMON BENGAL...
Page 284: ...WETCUT 3PNT PLUMBING 50IN MOWERS 2014 Alamo Group Inc Parts Section 6 104 COMMON BENGAL...
Page 286: ...WETCUT 3PNT PLUMBING LARGE MOWERS 2014 Alamo Group Inc Parts Section 6 106 COMMON BENGAL...
Page 288: ...WETCUT FRONT PLUMBING 50IN MOWERS 2014 Alamo Group Inc Parts Section 6 108 COMMON BENGAL...
Page 290: ...WETCUT FRONT PLUMBING LARGE MOWERS 2014 Alamo Group Inc Parts Section 6 110 COMMON BENGAL...
Page 292: ...WETCUT 50IN SPRAYER HEAD ASSEMBLY 2014 Alamo Group Inc Parts Section 6 112 COMMON BENGAL...
Page 294: ...WETCUT 60IN SPRAYER HEAD ASSEMBLY 2014 Alamo Group Inc Parts Section 6 114 COMMON BENGAL...
Page 296: ...WETCUT CABLES 2014 Alamo Group Inc Parts Section 6 116 COMMON BENGAL...
Page 297: ...WARRANTY SECTION Warranty Section 7 1...
Page 298: ......
Page 302: ...Printed in USA Tiger Corporation...