Assembly Section 2-17
ASSEMBLY
TURNBUCKLE ADJUSTMENT
Extend the outboard cylinder until the deck touches the stop on the draft beam.
Hold the deck in this position to adjust the lift cable tension. Adjust turn buckle until
cable is tight.
Lower and raise the deck to check adjustment. The mower deck should reach
it’s stop on the draft beam at the same time the outboard cylinder reaches it’s
extreme extended position.
Finally tighten the turn buckle lock nuts securely. It will be necessary to readjust
the turn buckle after the cable has stretched from use.
FINAL PREPARATION FOR OPERATION
Place operators safety and operation decals on the steering column and side
counsel where they are clearly visible to the operator. These decals should be
understood by each operator of the machine in conjunction with the safety and
operation section of this book. The decals are to remain in good condition as a
reminder to the operator, and should be replaced if damaged.
Double check that all pivot points have been greased. Secure all hoses together
with zip ties and wrap with split hose sections where friction may occur on the hose.
BEFORE starting or operating the tractor you must read and understand
the safety and operation sections of this manual completely.
Before operating the mower
, the cutter head and draft beam should be slowly
moved throughout the full range of motion. Watch for any condition that would cause
pinching or excess stress on the hoses. The steering and front axle travel should
also be carefully moved through their full range of motion. If any condition occurs in
which the hoses contact the tires, the steering and / or front axle travel may need to
be limited as described in the tractor operators manual. This should also be done if
the tires rub, or are extremely close to any other part of the mower such as the
hydraulic tank or draft beam. This may include adding shims, or adjusting stop bolts
in the tractor front to solve the problem. While checking motion, you should also
check that the control circuits are connected according to the operators decal for the
valve handles.
MOWER TESTING
Take the tractor to a place free of loose objects on the ground. Operate the
cylinders through their full range of motion again, to clear the lines of air. Follow the
instructions in the operation section to operate the mower. Vibration of the mower
should be minimal at all times. After a 5 minute test run, the knife bolts should be
retorqued and once again after the first few hours of operation.
If any parts of this assembly section, or any other section of this
manual are not clearly understood you must contact your dealer or the
address on the front of this manual for assistance!
Summary of Contents for 6020009
Page 4: ......
Page 6: ......
Page 7: ...Twin Rtry Safety Section 1 1 SAFETY SAFETY SECTION...
Page 24: ...Twin rtry Safety Section 1 18 SAFETY 34852 HYDRAULIC TANK...
Page 27: ...ASSEMBLY SECTION Assembly Section 2 1...
Page 35: ...Assembly Section 2 9 ASSEMBLY Picture 4 Picture 5...
Page 37: ...Assembly Section 2 11 ASSEMBLY...
Page 48: ...Assembly Section 2 22 ASSEMBLY...
Page 49: ...Twin rtry Operation Section 3 1 OPERATION OPERATION SECTION...
Page 57: ...Twin rtry Operation Section 3 9 OPERATION INSPECTION SHEETS...
Page 62: ...Twion Rtry Operation Section 3 14 OPERATION...
Page 63: ...Twin Rtry Maintenance Section 4 1 MAINTENANCE MAINTENANCE SECTION...
Page 85: ...PARTS SECTION FORD TS 115 135A CAB WOC TWIN ROTARY Parts Section 5 1...
Page 88: ...Parts Section 5 4 TRACTOR MOUNT KIT MAIN FRAME...
Page 90: ...Parts Section 5 6 TRACTOR MOUNT KIT HYDRAULICS TRR...
Page 92: ...Parts Section 5 8 TRACTOR MOUNT KIT HYDRAULICS TRAILKAT...
Page 94: ...Parts Section 5 10 TRACTOR MOUNT KIT BRACE BATT CAB WOC...
Page 96: ...Parts Section 5 12 CABLE LIFT VALVE 2SP CAB WOC...
Page 98: ...Parts Section 5 14 COMBO LIFT VALVE 2SP CAB WOC...
Page 100: ...Parts Section 5 16 CABLE LIFT VALVE 3SP CAB WOC...
Page 102: ...Parts Section 5 18 COMBO LIFT VALVE 3SP CAB WOC...
Page 104: ...Parts Section 5 20 MIRROR BRACKET...
Page 106: ...Parts Section 5 22 HYDRAULIC COOLER ASSEMBLY CAB...
Page 114: ...Parts Section 5 30...
Page 115: ...TWIN ROTARY COMMON SECTION COMMON PARTS SECTION...
Page 118: ...Twin Rotary Common Section 6 4 REAR ROTARY DECK ASSEMBLY...
Page 122: ...Twin Rotary Common Section 6 8 REAR ROTARY CASTER WHEEL 3PT ASSEMBLY...
Page 124: ...Twin Rotary Common Section 6 10 REAR ROTARY HYDRAULICS...
Page 126: ...Twin Rotary Common Section 6 12 60 ROTARY MOTOR...
Page 128: ...Twin Rotary Common Section 6 14 PUMP SERVICE PARTS 06504002...
Page 130: ...Twin Rotary Common Section 6 16 2 SP HUSCO LOAD SENSE 31320...
Page 132: ...Twin Rotary Common Section 6 18 2 SP HUSCO LOAD SENSE 31321...
Page 134: ...Twin Rotary Common Section 6 20 3 SP HUSCO LOAD SENSE CABLE 06502043...
Page 136: ...Twin Rotary Common Section 6 22 3 SP HUSCO LOAD SENSE COMBO 06502044...
Page 138: ...Twin Rotary Common Section 6 24 SIDE COOLER...
Page 144: ...Twin Rotary Common Section 6 30 SWITCHBOX SCHEMATIC...
Page 145: ...WARRANTY SECTION Warranty Section 7 1...
Page 146: ......
Page 150: ...Printed in USA Tiger Corporation...