28
vd81-201113
3 Installation
3.1 Installation Notes
Unauthorized modifications or conversions of the instrument are
not allowed!
Installation location
: Indoor
For not fully air conditioned open buildings and operation rooms:
Temperature:
+5°C ... +50°C
Rel. Humidity:
5 - 85%, not condensing
Air pressure:
860 - 1060 hPa (mbar)
3.2 Vacuum Connection
Dirt and damage, especially at the vacuum flange, have an ad-
verse effect on the function of this vacuum component.
Please take account of the necessary instructions with regard to
cleanliness and damage prevention when using vacuum compo-
nents.
-
Remove the protective cover (is required again during maintenance work!)
-
Make vacuum connection via small flange DN16 ISO KF; the vacuum vessel
should be electrically grounded
-
Use metal clamps, that can be opened and closed with appropriate tools only
(e.g. strap retainer-tension-ring)
-
Use sealing rings with a centering ring.
Overpressure in the vacuum system > 1 bar
Accidental or unintended opening of clamp elements under
stress can lead to injuries due to parts flying around!
Overpressure in the vacuum system 1.5 to 4 bar
KF flange connections with elastomer sealings cannot withstand
such pressures. Process media thus can leak and possibly
damage your health.
Summary of Contents for VD8 Series
Page 19: ...19 vd81 201113...
Page 21: ...21 vd81 201113 Konformit tserkl rung...
Page 22: ...22 vd81 201113...
Page 40: ...40 vd81 201113...
Page 42: ...42 vd81 201113 Declaration of Conformity...
Page 43: ...43 vd81 201113...
Page 44: ...vd81 201113...