Wiring Instruction 

There is no restriction on the type of cable to be used but careful consideration should be applied when calculating the 
size of cable for larger installations. Voltage drops should comply with the latest I.E.E. wiring regulations. All luminaires 
should be properly earthed.  
 

Maintained/ Non Maintained Version 

These types of luminaire require a switched live for standard operation under mains operation (maintained) and a 
permanent line for the emergency gear. The permanent line provides a reference for the emergency gear and a source to 
charge the batteries when in standby mode. The luminaire is supplied with a fused terminal block. Connect the terminal 
marked “USL” to a permanent supply. Connect neutral and switched line (SL) to the other terminals for maintained 
operation of the luminaire. 
Check that the green supply LED illuminates when mains are applied. After an initial charge follow the test procedure as 
detailed later. Ensure that the battery leads are never short circuited when disconnected. Both of the above versions may 
be wired to a test switch if required on the unswitched line (USL), but remember when testing to remove the switched 
line on the maintained version first.  
 

Dali 

Connect the Dali connections into the terminals marked DA DA. 

 

Servicing and Lamp Replacement 

SERVICING e.g. CLEANING, GEAR OR FUSE REPLACEMENT SHOULD ONLY BE CARRIED OUT AFTER THE 
LUMINARE HAS BEEN ELECTRICALLY ISOLATED AND ALLOWED TO COOL. 
 
The life of the batteries will generally depend upon the ambient temperature of the installation. A life of at least five 
years can normally be expected. If during routine testing the specified discharge is not achieved then the batteries should 
be replaced. 
 
LED Replacement - A long life of continuous operation is expected and replacement should not be necessary, if however 
the led strip fails contact us for replacement(s). 
 
INITIAL TESTING: Charge the batteries for 24 hours and then turn off the unswitched live feed by operating the 
luminaire test switch, if fitted (push and hold) or the supply source as necessary. Check for correct operation. 
 
ROUTINE TESTING: The unswitched live feed should be interrupted once a month for a short period of time to ensure 
that the emergency circuit is functioning correctly. Every six months the circuit should be operated for 1 hour and every 
three years for a period of 3 hours. 
 
IMPORTANT 
This product should NOT be modified. Any modification may render this product unsafe and will invalidate its 
safety/approval marks. Philip Payne Ltd. Will not accept responsibility for any damage caused as a result of their 
modification. Installation of this product should only be carried out by competent person(s). If in any doubt, consult a 
qualified engineer. 
 
WARNING 
Ensure mains are fully isolated before servicing; high voltages greatly in excess of mains voltages can be present during 
operation. Failed lamps should be replaced promptly or the circuit switched off to avoid possible damage to control gear. 
Continual operation at mains voltages in excess of the rated voltage will reduce lamp and expected gear life, and may 
contravene any relevant certificate requirements. A copy of our safe use for luminaires guide is available to download 
from our website. 
 

 

Philip Payne Ltd 

A SUBSIDIARY OF F.W. THORPE PLC 
Thornhill Road, Lode Lane, Solihull, B91 2HB, England.   

Tel:  

0121 705 2384  

Fax:  

0121 711 2469 

E-mail:  

[email protected]

 

Website: 

http://www.philippayne.co.uk

 

Philip Payne Ltd registered in England No. 1361523

 

 

 

 

 

 

 

 

 

 

 

 

 

 

21LFT190_3 

Reviews: