BP209 Series
7 Operation Instructions
Page 86
21424-D02
7.2.6.2 Connecting M2MS to the PC
The M2MS comprises integrated control electronics with translation stage controller, a USB 2.0
hub and a current source for the alignment laser.
j
Switch to enable Alignment Laser
k
Output connector for Alignment Laser
l
USB 2.0 hub output ports (to Beam Profiler)
m
USB 2.0 input (from PC)
n
Yellow indicator "Stage active"
o
Green indicator "Power On"
p
DC power supply input
q
M2MS power switch
Attention!
Prior to connecting the M2MS to the power supply, make sure the
! Otherwise the stage drive may be damaged!
Attention!
It is strongly recommended that only the supplied USB cables are used to connect the Beam
Profiler and the control PC to the M2MS.
The use of other than the supplied USB cables may lead to USB connection instabilities.
Attention
Do NOT connect the M2MS to a computer prior to installing the Beam Software!
1. Remove the
.
2. Connect AC power to the power supply and its output to the DC jack (
).
3. When using a BP209 Series Slit Beam profier, connect the beam profiler using the supplied
angled USB 2.0 cable to one of the USB hub outputs (3).
4. Switch the M2MS on (8). The green
Power On
indicator lights up.
5. Connect the M2MS to the PC using the supplied 3 m long USB 2.0 cable; do not start the
BEAM software yet.
6. The PC's operating system recognizes the connected new hardware and performs the driver
installation:
83
83
86
Summary of Contents for M2MS
Page 2: ...Copyright 2022 Thorlabs Version Date 8 1 14 Feb 2022 ...
Page 73: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 71 Example ...
Page 92: ...BP209 Series 7 Operation Instructions Page 90 21424 D02 ...
Page 119: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 117 ...
Page 158: ...BP209 Series 11 Appendix Page 156 21424 D02 11 10 Drawing M2MS BP209 ...
Page 162: ...BP209 Series 11 Appendix Page 160 21424 D02 11 14 Certifications and Compliances ...
Page 167: ...www thorlabs com ...