![THOR Salamander GL163-N Installation And Operation Instructions Manual Download Page 9](http://html1.mh-extra.com/html/thor/salamander-gl163-n/salamander-gl163-n_installation-and-operation-instructions-manual_1110396009.webp)
8
Installation (Continued)
Commissioning
The following commissioning checks must be carried out before the appliance is handed over for
use, to ensure that the unit operates correctly and the operator(s) understand the correct
operating procedure.
1. Before leaving the new installation;
a. Check the following functions in accordance with the operating instructions specified in the
‘Operation’ section of this manual.
•
Light the Main Burners.
•
Check the Low Fire burner operation.
•
Check the High Fire burner operation.
•
Check the Racking System operation.
b. Ensure that the operator has been instructed in the areas of correct lighting, operation, and shutdown
procedure for the appliance.
2. This manual must be kept by the owner for future reference, and a record of Date of Purchase, Date of
Installation and Serial Number of Unit recorded and kept with this manual. (These details can be
found on the Rating Plate attached to the R/H side panel (refer to the ‘Gas Connection’ section).
NOTE:
If for some reason it is not possible to get the unit to operate correctly, shut off the gas supply
and contact the supplier of this unit.
Summary of Contents for Salamander GL163-N
Page 14: ...13 Explosion drawing...
Page 15: ...14 Explosion drawing Spare Parts List...
Page 16: ...15 Spare Parts List Continued...