Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 36

34. Main Venter Motor and Wheel (Models 800 and 1200 only)

The main venter motor and wheel is located on the top of the first heat section of a
Model LDAP 800 and 1200. The vent system attaches to the collar on the top of the
main venter housing.

Remove dirt and grease from the motor casing, the venter housing, and the venter
wheel. Venter motor bearings are permanently lubricated.

Follow the instructions in Paragraph 33 for replacement of the venter motor and wheel
assembly. Keep all hardware removed to be used in re-assembling and installing the
replacement parts. See 

FIGURE 27

 for venter wheel and motor spacing.

35. Fan Motor(s),

Fan Blades,
and Guard(s)

FIGURE 28- Fan Blade
Position on the Shaft

(76mm)

Fan

Motor

Fan

Blade

Main Venter

Motor

Motor Wire

and Cable Assy

Screw

Flat Washer

Hex Nut

Exhauster Motor Base Assy

Wheel

1-1/4” (32mm)

Main Combustion
Air Pressure
Switch

Venter Housing

Venter
Motor

FIGURE 27- Venter Motor
and Wheel Spacing on
Main Venter (Size 800 and
1200)

33. Heat Section

Venter Motor
and Wheel
(cont’d)

Replacement Instructions

7/16” (11mm) inside

FIGURE 26 - Venter Wheel
Position on Shaft - applies
to all heat section venter
assemblies

Remove dirt and grease from each motor, fan guard, and blades. Use care when
cleaning the fan blades to prevent causing misalignment or imbalance. Check that the
hub of the fan blades is secure to the shaft.
Follow these instructions for replacement of the fan guard, fan motor and/or fan blades.
Repeat the procedure for each heater section.

1.

If the heater is installed, turn off the gas and disconnect the electric power.

2.

Open the access door and disconnect the fan motor wires, capacitor wires at the
capacitor, and ground screw.

3.

 Remove the assembled parts (the fan guard, the motor and the fan blade).

4. 

Disassemble and replace whatever parts are needed and reassemble using

whatever part(s) are being replaced and the original parts.

Be sure the fan blade is in the proper position on the shaft; refer to the illustration
in 

FIGURE 28.

Position the assembly on the heater. Attach the fan guard.
Rotate the fan blade to check for adequate clearance. If adjustment is required,
loosen the mounting screws, re-position the fan guard, and tighten the screws.

1. Turn off the gas and disconnect the electric power.
2. Open the burner/control compartment access panel.
3. Disconnect the three venter motor wires at the DSI control, capacitor wires at

the capacitor, and ground screw (located on the control panel).

4. Holding the venter motor, remove the six screws that attach the venter motor

mounting plate to the venter housing. Remove the motor and wheel assembly
from the heater.

5. Re-assemble with the replacement venter motor and

wheel assembly. See 

FIGURE 26

.

6. Follow the wiring diagram to connect the venter wires.
7. Replace the access panel. Restore power to the heater

and turn on the gas. Light, following the instructions on
the lighting instruction plate. Check for proper opera-
tion.

Summary of Contents for Reznor LDAP 1200

Page 1: ...s 22 25 Table of Contents Page Warnings 1 Installation Operation 2 29 Check Test Startup 30 31 Accessories 32 Maintenance Service 32 40 FOR YOUR SAFETY If you smell gas 1 Open windows 2 Don t touch el...

Page 2: ...e consulted before installation is made to verify local codes and installation procedure requirements Special Installations Aircraft Hangars Repair Garages Parking Garages Installations in aircraft ha...

Page 3: ...iple heater controls high temperature tape and or a high altitude kit If the heater is being installed at an elevation above 2000 ft 610M the input rate will have to be derated This is done by adjusti...

Page 4: ...4 83 83 83 btuh 332 000 664 000 996 000 kw h 97 2 194 4 291 6 1 1 1 4 1 1 4 6 8 8 1 0 2 0 3 0 5 6 13 6 19 4 5 5 12 8 18 5 1150 2448 3730 1230 2597 3959 55 55 55 cfm 5589 11178 16768 m 3 minute 158 317...

Page 5: ...added to the discharge openings see dimensions on page 32 HANGER LOCATION 1 2 13 FEMALE THREAD 34 3 4 883mm A 11 7 8 302mm 7 8 22mm 14 7 8 378mm 28 1 8 714mm AIR DESTRATIFICATION FAN CONTROL 43 1 2 1...

Page 6: ...ot less than 50 cubic feet per 1000 BTUH of the installed appliance Under ALL conditions enough air must be provided to ensure there will not be a negative pressure condition within the equipment room...

Page 7: ...0 to end of floor coverage Length of floor coverage Y X Z Distance from 0 to the point where the air velocity drops below 50 feet 15 2M per minute Throws listed are with standard louvers facing one di...

Page 8: ...n general a heater should be located from 15 40 feet 4 6 12 2 M above the floor If two or more heaters are installed in the same room a general scheme of air circulation should be maintained for best...

Page 9: ...scharge air openings to structural supports Addi tional clearance will be required if an optional nozzle is to be field installed Determining the need for installing vibration or noise isolation is th...

Page 10: ...e right half one way and left the other as illustrated in FIGURE 6 Airflow direction depends on how the louvers are installed WARNING This appliance is equipped for a maximum gas supply pressure of 1...

Page 11: ...t the pipe nipple that extends outside the cabinet IMPORTANT Two pipe wrenches are required when installing gas piping The gas pipe that is supplied with the heater MUST be held with a pipe wrench to...

Page 12: ...om eter to the 1 8 pipe outlet pressure tap in the valve NOTE A manometer fluid filled gauge is recommended rather than a spring type gauge due to the difficulty of maintaining calibration of a spring...

Page 13: ...60 344000 7001 8000 2136 2440 336000 278880 252000 672000 557760 336000 1008000 836640 336000 8001 9000 2441 2745 328000 272240 246000 656000 544480 328000 984000 816720 328000 9001 10000 2746 3045 32...

Page 14: ...ge gas valve on Size 400 or for staging heat sections on Sizes 800 and 1200 conduit and have a minimum temperature rise rating of 60 C Conduit must be run so as not to interfere with the heater access...

Page 15: ...R R OPT CL2 W R 1C30 341 W S23 6 SUBBASE W G W2 R W1 G W2 Q674G SUBBASE OPT CL7 T874F THERMOSTAT W2 R W1 W1 R G Q674C SUBBASE OPT CL18 T874F THERMOSTAT RH W2 RC W1 G W2 W1 R G OPT CL3 T874F THERMOSTA...

Page 16: ...UNIT 1 TERMINAL STRIP Y2 Y1 C UNIT 1 TERMINAL STRIP Y2 Y1 C TERMINAL STRIP UNIT 2 Y2 Y1 C TERMINAL STRIP UNIT 2 Y2 Y1 C Y2 Y1 C TERMINAL STRIP UNIT 3 UNIT 3 TERMINAL STRIP TERMINAL STRIP Q674G SUBBASE...

Page 17: ...unction to shutoff the burner If the main combustion air pressure switch opens it will interrupt the electric supply to all gas valves If a heat section pressure switch opens it will interrupt the ele...

Page 18: ...le fan control for the desired temperature setting for energizing the circulating air fan s The fan control setting should be set 5 to 10 F higher than the wall mounted thermostat setting The heater i...

Page 19: ...ds the spark is de ener gized and the control proceeds to heat fan on delay If flame has not been sensed during the first 16 seconds the control de energizes the spark output and keeps the gas valve e...

Page 20: ...0 and 1200 If the heat section pressure switch or main combustion air pres sure switch opens before the trial for ignition period the heat section venter motor and main venter motor will run through t...

Page 21: ...ergized then the control will lockout with the green LED off The control assumes either the contacts of the relay driving the gas valve have welded shut or the sensing circuit has failed The heat sect...

Page 22: ...Use 18 gauge wire for all wiring on the heater 5 Line and fan motor branch wire sizes should be of a size to prevent voltage drops beyond 5 of supply line voltage 6 Size 400 see thermostat wiring dia...

Page 23: ...TAGE SEE NOTE 7 on page 22 40 VA CONTROL TRANSFORMER Y BR BL 8 L1 L3 L1 B BL 8 Y L3 7 BR FAN DISCONNECT SWITCH SEE NOTES on page 22 T1 L1 L2 T2 L3 T3 CUSTOMER S FUSIBLE LOCKABLE ON OFF DISCONNECT BK Y...

Page 24: ...ADJUSTABLE FAN CONTROL DESTRAT MAIN COMBUSTION AIR SWITCH PRESSURE C BL NO R G SCREW GRD PERMISSIVE RELAY CONTACTS 1 FAN COM FUSE C R W G ATO OR ATC 3 0 AMP SWITCH SETTINGS SEC Y L1 BL 10 R R SW1 BR...

Page 25: ...BK W F RELAY CONTACTS PERMISSIVE 4 2 5 C PR L1 O PR BL 1 DESTRAT RELAY CONTACTS GRD SCREW G BL PRESSURE G GRD BL L1 B BL 8 Y L3 7 BR BL 1 FAN 2 4 R LIMIT CONTROL MANUAL RESET HIGH LIMIT GAS VALVE BL...

Page 26: ...ion A properly sized vent system is required for safe operation of the heater An improperly sized vent system can cause unsafe conditions and or create condensation Do not vent into an existing gravit...

Page 27: ...ll pipe to the heater see FIGURE 17A To attach the vent cap see FIGURE 17B FIGURE 17A Attaching Double Wall Type B Vent Pipe to the Venter Outlet A double wall pipe run is allowed only if at least 75...

Page 28: ...immediately after STEP 1 Figure 17C STEP 2 Insert the pipe with the sealant into the inner pipe of the double wall pipe until the bead of sealant contacts the inner pipe creating a sealed joint Figur...

Page 29: ...structions in FIGURES 16B and 16C pages 26 and 27 to join a double wall vent terminal section to a single wall vent run and to the vent cap 6 152mm minimum Roof pitched from 0 to 45 A clearance thimbl...

Page 30: ...nguish any open flame Immediately call your gas supplier Use only your hand to turn the gas control ON OFF knob on the gas valve Never use tools If the valve ON OFF knob will not turn by hand do not t...

Page 31: ...h Sizes 800 and 1200 and each heat section pressure switch close firing the heater 12 Burner flame is sensed and in 30 seconds after the gas valve is energized the fan motor s is energized 13 If the f...

Page 32: ...intenance Schedule NOTE If replacement parts are required use only factory authorized parts WARNING If you turn off the power supply turn off the gas See Hazard Levels page 2 OPTIONAL ACCESSORIES 26 4...

Page 33: ...d of the union 2 Turn off electric supply 3 Disconnect the gas supply at the union outside of the cabinet 4 Remove the access panel 5 Disconnect the Gas Train and Move It Out of the Way At the gas val...

Page 34: ...at ex changer section With the light shining into the heat exchanger observe the outside for visible light Repeat this procedure with each heat exchanger section If any light is observed replace the h...

Page 35: ...ze 400 has one control mod ule Size 800 has two control modules and Size 1200 has three control modules Proper operation of the direct spark ignition system requires a minimum flame signal of 1 0 micr...

Page 36: ...ecure to the shaft Follow these instructions for replacement of the fan guard fan motor and or fan blades Repeat the procedure for each heater section 1 If the heater is installed turn off the gas and...

Page 37: ...ensure positive closure See Hazard Levels page 2 The combination gas valve must be checked annually to ensure that the valve is shutting off gas flow completely Instructions 1 Locate the 1 8 NPT press...

Page 38: ...h Main combustion air pressure switch or heat section pressure switch is closed before venter is energized Steady Off Blown fuse No power or Defective board Undesired flame valve open and no call for...

Page 39: ...low 3 Supply pressure should be 5 14 w c for natural gas or 11 14 w c for propane gas 4 No Spark 4 a Loose wire connections a Be certain all wire connections are solid b Transformer failure b Be sure...

Page 40: ...d to furnace chassis 4 Faulty integrated circuit board 4 If 24 volt is available to the integrated circuit board and all other causes have been eliminated replace board 5 a Make sure unit is properly...

Reviews: