background image

TOP PLATE

INSTALLATION INSTRUCTIONS

FOR CONCEALED SERVICE FLOOR BOX

Catalog Number: 665-AV2

IMPORTANT:

 Read all instructions before installing floor box, carpet plate or mounting kit.

TA04486  A      Page 1 of 2

MINIMUM CONCRETE DEPTH FOR THE 
665-AV2 FLOOR BOX IS:

 

4-1/2” DEEP

WARNING

ELECTRICAL HAZARD!

 BE SURE POWER IS OFF!

CAUTION

FLOOR BOX SHOULD BE INSTALLED 

BY A QUALIFIED ELECTRICIAN IN 

ACCORDANCE WITH NATIONAL AND 

LOCAL ELECTRICAL CODES.

INSTALLATION INSTRUCTIONS

(BEFORE CONCRETE POUR)

1. Remove the top of box, loosen (4) top screws and 

rotate top plate away from screws. See figure 2.

2. Install (4) ground screws. See figure 3.
3. Install conduit connectors as needed.
4. Break/trim off partition from non-metallic tunnel. 

Place non-metallic tunnel and partition in box.       

See figure 1.

5. Install (4) leveling screws. See figure 4.
6. Replace top and tighten (4) top screws. See figure 4.
7. Adjust leveling screws so that top edge of box is 

1/16” below screed line. Attach conduit and secure 

box to form. See figure 4. Box is now ready for 

concrete pour.

Figure 1

Figure 2

Figure 3

Figure 4

665-CST

(NOT-INCLUDED

NON-METALLIC
WIRING TUNNEL

DEVICE PANEL
(NOT INCLUDED)

665-AV2
FLOOR BOX

LOOSEN SCREWS
ROTATE PLATE

INSTALL GROUND
SCREW (4-PLACES)
(FURNISHED)

LEVELING SCREWS
(FURNISHED)

665-AV2
ASSEMBLY

PARTITION

(Save for STEP 10)