2.1.3 Cable
gland
In order to carry out an EMC-compatible installation the cable screen (excepted the supply cable,
which is normally not shielded) is to be connected to the contact spring of the screwed cable gland
(see
) For wiring plan ref. to chap.
1. With the Standard Contacting (see
)
- Strip back the outer sheath and screen (shielding)
- Make a round cut in the outer sheath approx. 15 mm along but do not remove the sheath
- Guide the cable through the cable gland
- Pull off the outer sheath
- Pull back the cable until the connection is made between the cable screen and contact spring
- Turn shut… and it is ready for use!
2. With thin Wires without an Inner Sheath (see
)
- Strip back the outer sheath
- Pull back the screen braid approx. 15-20mm over the outer sheath
- Insert the cables into the cable gland until the contact is made between the cable screen and
contact spring
- Turn shut ….and it is ready for use!
3. When Routing the Cable Screen to another Connection (see
3
)
- Expose the screen braid approx. 10 mm
-Guide the cable through the cable gland until the connection is made between the cable screen and
contact spring
- Turn shut…and it is ready for use!
Figure 10: Screen cable connection to the cable gland
12 - 56
021579/06/09