![ThermoSphere SCP-B Instruction Manual Download Page 5](http://html1.mh-extra.com/html/thermosphere/scp-b/scp-b_instruction-manual_1106257005.webp)
5
Before you start
Your thermostat should be:
•
Installed at least 1.2m from the floor
• On an internal wall
• Outside any wet zones (IP30)
• Installed on an RCD protected circuit
•
Away from any hot or cold influences
•
Installed so that the floor sensor probe can be laid in a
heated area of the floor
• Installed by a professional, in line with current
electrical regulations and relevant local standards