background image

Installation guide

Installation guide

Barrel Nº63

Barrel Nº63

BARRELS

BARRELS

PARTS 1

x3

x2

x2

x1

x1

x2

x4

x1

x6

x2

x1

x2

x1

*if needed for

heater installation.

A

H

J

B

D

F1

J1

V

C

O

J2

I

E

L

R

CRADLES

FINAL H-TYPE 

TOP STAVE

INTERIOR 

BENCHES

FRONT 

PANEL

RIGHT 

PANEL 

SECTION

(BACK)

BENCH 

SUPPORTING 

LEGS

WIRE 

RACEWAYS

ASPEN 

ROOF 

BOARD

BACKREST 

STAVES

METAL 

BANDS

LEFT PANEL 

SECTION 

(FRONT)

FLOORING 

DUCKBOARD

ADHESIVE 

ROOF TAPE

x1

CENTER 

STAVE

x80 (+1 

reserve)

RIGHT 

SIDE BODY 

STAVES

PARTS 2

+

+

x10

W

DECORATIVE 

ROOF NISHING 

BOARDS

x8

x70

x2

x2

x4

x24

x120

x24

M

P

U

P1

N

N1

SCREW 

5.0X120

SCREW 

4.0X50

Ø BOLT

16X140

HEX NUT

M16 (SW24)

FLAT 

WASHER

STAINLESS 

STEEL SCREW 

4.0X50

SCREW 

4.2X70

STAINLESS 

STEEL SCREW 

4.2X70

TOOLS 

REQUIRED:

x2

x2

x2

x2

x2

24mm

Rubber

x3

x3

3 People 

Recommended

x2

STEP ZERO

Before you begin, be sure the 

sauna will fit in your chosen 

location. 

Approximately 8’ x 8’ is ideal. 

Overall dimensions are shown here. 

Be sure the site is level and free of 

standing water after rainfall. 

Concrete, pavers or crushed stone 

is preferred.

7´´6´

7´´4´

x1

x2

Z

Z1

WATERPROOF 

ROOF COVER

WOODEN SLAT 

FOR ROOF 

COVER

x1

D1

REAR 

PANEL

x1

E1

LEFT PANEL 

SECTION 

(BACK)

x1

F

RIGHT 

PANEL 

SECTION 

(FRONT)

Summary of Contents for Barrels 63

Page 1: ...which is meant for 6 people has a window More text about the model Barrel Nº63 These installation guidelines are purely informative and based on the best knowledge currently available and they should be used accordingly We advise you to follow the regulations of your country where they conflict with the general recommendations found in this guide ...

Page 2: ...DECORATIVE ROOF NISHING BOARDS x8 x70 x2 x2 x4 x24 x120 x24 M P U P1 N N1 SCREW 5 0X120 SCREW 4 0X50 Ø BOLT 16X140 HEX NUT M16 SW24 FLAT WASHER STAINLESS STEEL SCREW 4 0X50 SCREW 4 2X70 STAINLESS STEEL SCREW 4 2X70 TOOLS REQUIRED x2 x2 x2 x2 x2 24mm Rubber x3 x3 3 People Recommended x2 6 STEP ZERO Before you begin be sure the sauna will fit in your chosen location Approximately 8 x 8 is ideal Over...

Page 3: ...urements a and b should be equal to ensure the cradles are square Be sure cradles remain level STEP FOUR Place front panel with sauna doors D and rear panel D1 into the trimmed grooves Be sure each panel is centered leveled and completely seated into the floor panel Bind these panels together by temporarily placing one or two body stave C on top of them STEP FIVE Two front side panels E F attach t...

Page 4: ...ess steel screws 4 2 x 70 N1 Hold the seat and leg assembly tight to the sauna wall Using a level make sure the bench seat is level from front to back This will ensure proper placement Install backrests J2 at your chosen height using stainless steel screw 4 0 x 50 P1 STEP NINE Wire raceways V and flooring duckboards L can be used for wiring runs confirm specific wiring runs needed for chosen stove...

Page 5: ...thermoryusa com Thermory USA Buffalo 56 Harvester Ave Ste 1 201 Batavia NY 14020 585 591 6590 support thermoryusa com thermoryusa com STEP TEN Place waterproof roof cover Z and fix it with wooden slat Z1 and screws 4 0 x 50 P Install front and rear decorative roof finishing boards W fixing by screws 4 0 x 50 P SEE HOW ASSEMBLY WILL LOOK HERE W P P Z1 W Z P ...

Reviews: