![Thermona THERM 90 KD.A Manual For Installation, Operation & Maintenance Download Page 19](http://html1.mh-extra.com/html/thermona/therm-90-kd-a/therm-90-kd-a_manual-for-installation-operation-and-maintenance_1105858019.webp)
19
THERM 90 KD.A
Before installing the boiler the assembly company is obliged to check:
the type of the boiler corresponds to the ordered boiler
the selection of the boiler is correct for the stated use (type of gas, heating system, collection of smoke, air suction)
the delivery is complete
3.2 Complete character of the delivery
THERM hanging boilers are delivered fully assembled. All parts of the boiler
are checked and set by the producer before assembly. Each boiler is tested
for leakage of the water circuit, leakage of the gas circuit and the regulating
and protection parts are set and tested.
3. INSTALLATION MANUAL
3.1 Basic instructions for assembly of the boiler
Hanging condensing boilers THERM 90 KD.A series are designed for operation in standard hot-water heating systems.
The standard delivery of the boiler includes:
1. Boiler
2. Manual for installation, service and maintenance of boiler
3. Service network
4. Warranty certificate (3 copies)
5. Protocol on the commissioning of THERM products into operation
6. Application for registration into the prolonged warranty programme
7. Confirmation of completing 1. and 2. service inspection
8. Hanging bar, including fixation elements
!
Assembly must only be performed by a qualified professional company and it is necessary to pay attention to
all advice and notifications contained in this manual. Assembly must be in accordance with valid standards and
regulations – see ČSN EN 1775, ČSN 38 6462, ČSN 33 2000 – 7 – 701 ed.2, ČSN 06 1008, ČSN 73 4201, TPG 704 01,
TPG 800 02, TPG 908 02, Regulation No. 48/1982 Coll.
Accessories:
Necessary accessories (collection of gases, regulation, outside sensor, etc.) can be ordered on request. Detailed information
can be found in the catalogue of products and accessories or at www.thermona.cz.
!
To collect smoke in the „C“ variant, it is necessary to exclusively use equipment to collect gases delivered by
the producer of the boiler. Only by doing this will the boiler report the stated parameters for burning, output,
efficiency, etc.
1
8
2
3 4
5 6
7
Content of delivery
In the case of any doubt or inquiries, contact the producer or supplier before assembly.