PRODUCTION CHECK
.
All boiler parts are rechecked and set by the manufacturer before they are assembled. Each boiler is tested for
water system staunchness, gas system staunchness; regulating and safety components are rechecked and set.
5
.
INSTRUCTIONS FOR INSTALLATION
Boiler mounting can only be done by a qualified expert company, while this has to respect all the advice and
notes in this manual. The mounting has to be carried out in correspondence with valid local norms and regulations.
The mounting company is required to check the suitability of the chosen boiler with respect to its functional
character and customer’s requirements. Further, it is necessary to check the label on the packaging to be sure the
delivered boiler corresponds with the ordered boiler and the fuel type. When it is unpackaged it is necessary to
check if the delivery is correct and complete. In case of any doubts, inform the manufacturer or the supplier before
mounting.
♦
POSITION OF THE BOILER
The THERM 28 KD boilers may be placed both in the interior and in the non-residential areas of a house (in a
boiler room, etc.). When placing the boiler inside a flat it is recommendable to set the limitation of maximum boiler
output at the lower level of the power loss range and reduce thus the noise that the boiler makes when being
operated at a lower output level.
The boilers are equipped with IP 41 covering of electrical parts and their position in all rooms in which there is a
tub or shower or which are used for bathing, must comply with the valid local norms.
The room where the boiler is placed must be a “common basic environment” as it is defined in the valid
regulations, which means that it has to be protected against frost with ambient temperature ranging from + 5 °C to
+ 35 °C with relative humidity lower than 80 %.
According to the valid norms, there are certain objects that must not get closer to the boiler than:
100
mm
for objects made of not easily flammable, heavily flammable and medium
flammable materials.
200 mm
for objects made of easily flammable materials (e.g. fibreboards, cellulose materials,
polyurethane, polystyrene, polyethylene, PVC, etc.)
Important:
No flammable objects can be placed closer than at the safe distance from the boiler (the minimum distance of the
appliance from flammable materials is 50 mm in the direction of the main heat radiation and 10 mm in the other
directions).
Before you start doing anything that could possibly change the environment of the installed boiler (e.g. working
with paints, adhesive agents, etc.), you must switch the boiler off by the mode switch (pointer to the left).
♦
BOILER HANGING
Before the boiler is mounted make sure the chosen place meets the requirements for flue exhaust placement and
for minimum distances stated in the previous sections. Using the dimension scheme (see back pages in this manual)
prepare the anchorage by which the boiler will be mounted.
♦
BOILER CONNECTION TO WARM WATER SYSTEM
Since the THERM boiler is a warm-water through-flow boiler that is equipped with its own pump, it is possible to
connect it to any existing gravity circulation system or to any new technologies designed for the forced water
circulation in the heating system. With regard to the rapid temperature rise and a relatively high flexibility of the
system, it is recommendable to use small volume radiators and the least dimensioned piping in the case of a new
distribution system. The piping system has to be duly projected on the basis of hydraulic ratio calculations and total
transmitted power. In order to use the condensation regime as effectivelly and economically as possible it is
advisable to dimension the heating system for lower temperatures (
∆
t = 50/30 °C). If you want to achieve the
maximum output of the flue exchanger and ensure a proper functioning as well as long durability of the whole
system, it is necessary that the minimum excess pressure of the heating system be 0.8 bar.
Before the boiler is connected to the heating system it is necessary to rinse it very carefully, so that all impurities
and sediments can be removed. The heating system has to be equipped with a suitable filter and comply with the
local norms.The inbuilt expansion vessel enables the boiler to be connected to a sealed heating system.
The necessary expansion volume for the given system must be calculated according to the following formula:
Summary of Contents for Therm 28 KD
Page 1: ...Manual for Installation and Maintenance of Condensing Boilers Therm 28 KD KDZ KDC...
Page 17: ...11 Wiring connect of the THERM 28 KD boilers with the DIMS03 TH01 automatics 17...
Page 18: ...12 Wiring connect of the THERM 28 KDC boilers with the DIMS03 TH01 automatics 18...
Page 19: ...19 13 Wiring connect of the THERM 28 KDZ boilers with the DIMS03 TH01 automatics...