3
Terminator
TM
ZS/ZE
INSTALLATION PROCEDURES
1.
Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to
aid in piercing grommet. Leave additional
cable for expansion loop. See page 4 for
multiple cable installation tips.
2.
Insert cable into expediter. If mounted on
bottom or side of pipe, punch out weep hole.
Note: For HPT and FP cable, exchange
grommet in Terminator with GRW-G provided
in PETK-3.
3.
Slide expediter toward pipe and route cable
through support base entry.
4.
Insert banding guide into expediter and snap
into place..
5.
Mount expediter to pipe using pipe band. Do
not band over cable.
6.
Cut off end of cable. .
7.
Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instructions.
8.
Push excess cable back through expediter.
Tighten cap securely. Tape cable expansion
loop to pipe.
9.
Connect bus wires using small crimps and
connect ground wires using large crimp. See
page 9 for wiring details. Trim excess wire if
necessary.