background image

3

Terminator

TM

 ZS/ZE 

INSTALLATION PROCEDURES

1. 

Locate bus connection (HPT and FP only) and 
cable as shown. Cut end of cable at angle to 
aid  in  piercing  grommet.  Leave  additional 
cable  for  expansion  loop.  See  page  4  for 
multiple cable installation tips.

2. 

Insert  cable  into  expediter.  If  mounted  on 
bottom or side of pipe, punch out weep hole.

 

Note:  For  HPT  and  FP  cable,  exchange 
grommet in Terminator with GRW-G provided 
in PETK-3.

3. 

Slide expediter toward pipe and route cable 
through support base entry.

4. 

Insert banding guide into expediter and snap 
into place..

5. 

Mount expediter to pipe using pipe band. Do 
not band over cable.

6. 

Cut off end of cable. .

7. 

Terminate  cable  with  appropriate  PETK 
termination  kit.  Refer  to  PETK  installation 
instructions.

8. 

Push  excess  cable  back  through  expediter. 
Tighten cap securely. Tape cable expansion 
loop to pipe.

9. 

Connect  bus  wires  using  small  crimps  and 
connect ground wires using large crimp. See 
page 9 for wiring details. Trim excess wire if 
necessary.

Reviews: