10. 

Install power cable (if necessary).

11. 

Install quick mount terminal blocks and tighten 

screws (if necessary). Complete system wiring. 
Tightening 

torque 1.5 Nm–1.8 Nm (1.1 ft-lb–1.3 

ft-lb).

12. 

Install  junction  box  lid  and  twist  hand  tight. 

Insert screwdriver into ratchet slots located on 

side of junction box base.

13. 

Use screwdriver to ratchet on junction box lid. 
Lid will rotate 30 degrees. Lid latch mechanism 

fully engaged. To remove lid, repeat steps 12 

and 13 but in the opposite direction.

Locate bus connection (HPT and FP only) and cable 

as shown. Cut end of cable at angle to aid in piercing 

grommet. Leave additional cable for expansion loop.

Two Cable Layout Tips

Insert two cables into expediter. 

Note: For HPT and FP cable, exchange grommet in 

Terminator with GRW-G provided in PETK-3.

Power Connection (1 to 2 Heating Cables)

Wiring Details

End Termination (1 Heating Cable Only)

Ground

Power Supply 

Ground

L2 or N

L1

Ground

Form PN50848-0519