Terminator
TM
ZE-B Beacon
LED End of Circuit Light Kit
INSTALLATION PROCEDURES
Page 1: ...TerminatorTM ZE B Beacon LED End of Circuit Light Kit INSTALLATION PROCEDURES ...
Page 2: ...uidelines Proper personal protective equipment or PPE should be utilized during installation Contact Thermon if you have any additional questions TerminatorTM ZE B Beacon INSTALLATION PROCEDURES Item Quantity Description 1 1 Expediter Assembly Grommet Compressor Grommet Support Base with O Ring 2 1 Light Module Cover 3 1 Banding Guide 4 1 Banding 5 1 LED Light Module 1 2 4 3 Order Separately SCTK ...
Page 3: ...grommet in Terminator with GRW G provided in PETK 3 6 Cut off end of cable 7 Terminate cable with appropriate SCTK termina tion kit Refer to SCTK installation instructions Push excess cable back through expediter Remove braid pigtail Tape cable expansion loop to pipe 50mm 2 Max 300mm 12 Bus Connection Weep Hole 101mm 4 Min Do Not Band Over Cable 25mm 1 Min Expediter Assembly Boot Wire Crimp Heatin...
Page 4: ...Light Module Cover Lens Expediter Assembly Light Module Unlocked Position 9 Snap on crimp insulators Light Module Expediter Assembly Crimp Insulators 10 Slide silicone caps over crimp insulators Install Light Module to Expediter Silicone Cap TerminatorTM ZE B Beacon INSTALLATION PROCEDURES THERMON The Heat Tracing Specialists www thermon com Corporate Headquarters 100 Thermon Dr PO Box 609 San Mar...