For  power  connection  applications:  Use 

dimple molded into side of junction box base 

to locate center hole, drill for user supplied 

power  connection  fitting  per  manufacture’s 

recommendations.

13. 

Mount junction box on expediter making sure 

to align slots to properly orient junction box 

base.

Dimple for Center Line

Drilled thru (1) Wall

14. 

Install  quick  mount  terminal  blocks  twist  to 

position and tighten screws.

6. 

Cut splice cover top and splice cover bottom to 

match outside diameter of tubing bundle.

7. 

Mount expediter base with o-ring to splice 

cover bottom using (3) M5 mounting screws 

and lock washers. Punch out weep hole.

O-Ring

Splice Cover 

Bottom

Expediter Base

Weep 

Hole

9. 

Assemble splice cover top, tubing bundle, and 

splice cover bottom together as shown Snap 

together firmly. Inspect ends of tubing splice 

cover for snug fit. Apply additional RTV sealant 

where needed.

Align Slot

Terminal Blocks

(Typical)

Terminator DP/FAK-2 and FAK-2L

Cut and Remove

Ends to Fit

TubeTrace 

Tubing Bundle

Field Drilled 

(By Others)

8. 

Install the Silicone Gasket (cut off excess). Apply 

RTV Sealant to both halves.

RTV

Sealant

Splice Cover Top

RTV Silicone 

Gasket

Splice Cover 

Bottom

10. 

Apply self-vulcanizing tape around bundle jacket 

and work up over FAK ends.

11.

 

Terminate heat tracing with appropriate PETK 

termination  kit.  Refer  to  PETK  installation 

instructions (purchased separately) for details 

not addressed here. 

Power Connection

Boot

Ground Braid

Heat Tracing

Conduit and Wire (By Others 

For Power Connection Applications)

Reviews: