3
1.
Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to aid
in piercing grommet. Leave additional cable for
expansion loop.
Terminator
TM
DE-B Beacon
3.
Slide expediter toward pipe and route cable
through support base entry.
4.
Insert banding guide into expediter and snap into
place.
5.
Mount expediter to pipe using pipe band. Do not
band over cable.
2.
Insert cable into expediter. If mounted on bottom
of pipe, punch out weep hole.
6.
Cut off end of cable.
7.
Terminate cable with appropriate SCTK termination
kit. Refer to SCTK installation instructions. Push
excess cable back through expediter. Tape cable
expansion loop to pipe.
8.
Connect bus wires using small wire nuts (for BSX,
HTSX and KSX) or medium wire nuts (for RSX, VSX,
HPT and FP). See wiring schematic for connec-
tions.
50mm
(2")
Max.
300mm
(12")
Bus
Connection
Weep Hole
180mm
(7") Min.
Do Not Band
Over Cable
Wiring Schematic for LED Light
Light Module
Expediter Assembly
Wire Connector
Expediter Assembly
Boot
LED Light Pigtail
Heating Cable
Min.
300mm
(12")