Thermoheat LPFA125/L User'S Manual And Operating Instructions Download Page 9

ALL NEW CYLINDERS MUST BE PURGED BEFORE THE FIRST FILLING.

• Turn heater gas valve knob and gas tank valve to OFF position.
• Propane tank valve equipped with the old style fitting has LEFT HANDED THREADS. Turn POL fitting
  CLOCKWISE to loosen. Protect POL fitting when disconnected from tank.
• Have tank filled by your local Propane gas supplier.
• Fasten full Propane tank and connect POL fitting to tank valve by turning COUNTERCLOCKWISE.
• With heater gas valve knob still in the OFF position, turn ON tank valve and check for leaks 
  with soap solution.

PROPANE CONSTRUCTION HEATER

7

          

8

ProPane saFety

Propane is safe to use when properly handled. Careless handling of the Propane gas tank could

result in fire and/or an explosion. Therefore:

• Always keep tank/cylinder securely fastened in an upright position.

• Avoid tipping tank on its side when connected to a regulator since this may cause damage to

  diaphragm in regulator.

• Handle valves with care.

• Never connect an unregulated Propane tank to construction heater.

• Do not subject Propane tank to excessive heat.

• Tightly close the gas shutoff valve on the Propane tank after each use.

• The POL fitting must be protected when disconnected from the propane tank.

• Never store a Propane gas tank inside a building or in the vicinity of any gas burning appliance.

THE DISCONNECTED TANK MUST NEVER BE STORED IN A BUILDING, GARAGE

OR ANY OTHER ENCLOSED AREA.

leaK cHecKinG

Check all gas connections with a soap solution to be sure they are tight and leak proof.

• The installation of your heater must meet all local codes and/or gas utility requirements or, in the

   absence of local codes, with the Storage and Handling of Liquefied Petroleum Gases, ANSI/ NFPA

   58 and the Natural and Propane Installation Code, CSA B149.1.

• The minimum clearances to combustible construction:  Side - 24” (61cm); Top - 36” (91cm); 

   Front - 72” (1.8M); Floor - combustible, must be maintained at all times.

• The hose assembly should be visually inspected prior to each use of the heater. If it is evident that

   there is excessive abrasion or wear, or the hose is cut, it must be replaced prior to the heater being 

   put into operation.

• The replacement hose assembly shall be that specified by the manufacturer (Refer to parts list).

liGHtinG instructions

 

      

WARNING

Motor and fan must be running before lighting, during operation and shutdown, 

in order to prevent a flame-out condition which could result in personal injury or property damage.

NOTE: 

This heater uses a continuous spark ignition system.  This unit will continue to make a clicking/

ticking sound at all times before ignition, after ignition and during operation, regardless of valve knob 
positioning. 

1. Connect power cord to a properly grounded three (3) prong 120V, 60Hz, single phase receptacle.

2. Turn gas valve knob clockwise        to OFF    position.

3. Wait five (5) minutes to clear any gas. Then smell for gas, if you don’t smell gas, go to next step.

4. Turn gas supply ON by turning Propane tank valve counterclockwise        .

5. Push in and turn gas control knob counterclockwise        to “LOW/IGN”. This will light the burner. If

    needed, keep pressing control knob until the burner lights and keep depressing and turning from

    oFF     to low/ign.

6. Keep the valve knob depressed for at least 30 seconds after lighting the burner. After 30 seconds

    release valve knob.

7. if burner does not stay lit, repeat the lighting procedure.

8. When burner is lit, turn gas valve knob counterclockwise        to desired setting. 

NEVER LEAVE THE HEATER

UNATTENDED WHILE BURNING!

Summary of Contents for LPFA125/L

Page 1: ...ss or damage from the hazards of fire explosion burn asphyxiation carbon monoxide poisoning and or electrical shock Only persons who can understand and follow the instructions should use or service th...

Page 2: ......

Page 3: ...ON 65 Fuels used in gas or oil fired appliances and the products of combustion of such fuels contain chemicals known to the State of California to cause cancer birth defects or other reproductive harm...

Page 4: ...eath 3 Other standards govern the use of fuel gases and heat producing products in specific applications Your local authority can advise you about these IMPORTANT Read this user s manual carefully and...

Page 5: ...CSA B149 1 The minimum and maximum inlet pressures to the regulator from the gas tank are 5 psi and bottle pressure respectively Use only the regulator hose assembly provided with the heater Inspect...

Page 6: ...quired 4 Screws ST3 5x10 and 2 Cord Wrap Attachments Place the cord wrap attachment as shown then use Phillips screwdriver to tighten the screws and secure the cord wrap attachments 2 Regulator and Ho...

Page 7: ...Outlets and Inlet Connections A safety relief valve having direct communications with the vapor space of the tank An arrangement of vapor withdrawal The propane LP gas pressure regulator and hose asse...

Page 8: ...re that the cylinder is fully upright for vapor withdrawl see size capacity page 6 2 Connect hose to heater inlet Tighten firmly using a wrench You must use the regulator supplied with heater 3 Connec...

Page 9: ...ssembly should be visually inspected prior to each use of the heater If it is evident that there is excessive abrasion or wear or the hose is cut it must be replaced prior to the heater being put into...

Page 10: ...ny Mainte nance functions Unplug the unit from the 120V receptacle 2 Keep unit clean and keep the inside of the torpedo housing debris free 3 Have unit checked by a qualified technician at least once...

Page 11: ...urrent to electric outlet If voltage is correct electrical connec7on is made check power cord and extension cord for 2 Fan blade contacts inside of heater housing 2 Be sure that housing is not damaged...

Page 12: ...s only 100K 125K 150KS lo modelos 100K 125K 150K Les mod les Seulement PROPANE CONSTRUCTION HEATER LPFA125 Series Models Only LPFA 125 Series S lo Modelos LPFA125 S ries Les mod les Seulement NEVER LE...

Page 13: ...12 PROPANE CONSTRUCTION HEATER REPLACEMENT PARTS LIST MODELS RMC FA60 Series LPFA125 Series NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING...

Page 14: ...304828 2304939 16 MOTOR BRKT 1 2304937 2304938 17 VALVE GAS 1 5051233 5051235 18 PRESSURE SWITCH 1 N A 2305976 19 VALVE BRKT 1 2304624 2304624 20 BASE ASSY BLACK 1 2304923 2304924 21 POWER CORD ASS Y...

Page 15: ...long an implied warranty lasts so the above limitation may not apply to you Some states do not allow the exclusion or limitation of incidental or consequential damages so the above limitation or excl...

Page 16: ...SAVE THIS CARD Place Postage Stamp Here GHP Group Inc 8280 Austin Avenue Morton Grove IL 60053 3207 GHP Group Inc 8280 Austin Ave Morton Grove IL 60053 3207 Tel 877 447 4768 www ghpgroupinc com 8280...

Reviews: