- 19 -
5.2
INSTALLING THE FURNACE
Inappropriate positioning might damage the furnace or surrounding parts.
5.2.1
LOCATION
Requirements imposed on the operating location:
Humidity < 85%rH, non-condensing
Ambient temperature > 5°C and < 25°C
Even surfaces
Load-bearing capacity > 100kg
Temperature resistance > 60°C
Air quality of the ambient air should generally correspond to that of the
outside air
Components that are not permitted:
Grinding dusts (independent from material), spray oils, oil vapors, corrosive
gases or vapors and other chemical auxiliary materials i.e. scanner sprays,
separating agents etc.
The distance to the walls, ceilings or other devices should be > 5cm on each
side
The distance to flammable objects should be > 50cm on each side
The distance to hot objects should be > 50cm on each side
(monitor and check to exclude potential interactions)
Socket with grounding contact and separate electric circuit
Fuse preferably with automatic cut-out line protection switch D16A or
fusible cut-out
5.2.2
SETTING UP THE FURNACE
Step 1
Open the transport packaging on each side and remove. The
transport box can be stored and reused.
Screwdriver TX20
Step 2
Remove protective foils and accessories cardboard box and
dispose of them correctly.
Cutter knife
Step 3
Lift furnace and place it on the stand / table
Step 4
Mount the heating elements, if not pre-assembled
Chapter 5.2.3 “MOUNTING HEATING ELEMENTS”
Allen key SW3.0
Open-end wrench SW7
Step 5
Connect to power supply
Chapter 5.2.4 “ELECTRICAL CONNECTION”
Step 6
Connect to network (optional)
Chapter 5.2.5 “NETWORK CONNECTION”