6
•
Operation
Vanquish Charger Operating Manual
Page 49
Placing the Shelf inside the Compartment
TIP
You can either place the shelf inside the Charger first, and then load
the sample racks or well plates, or you can first load the sample racks or
well plates in the shelf, and then place the shelf inside the Charger.
1. Hold the shelf by the top and bottom handles and slide it on the
shelf locking rail on the base plate (
see Figure 6
). A recess for the
shelf locking rail is provided on the bottom side of the shelf.
2. Verify that the shelf has properly clicked into place on the shelf
locking rail.
Figure 6: Placing the shelf
The Charger will automatically detect the shelf type after the door has
been closed, and Chromeleon displays the number of available levels.
Summary of Contents for Vanquish Charger
Page 1: ...Vanquish Charger Operating Manual 4829 0001 EN Revision 1 0a September 2017 thermoscientific ...
Page 4: ...Contacting Us Page 4 Vanquish Charger Operating Manual ...
Page 8: ...Contents Page 8 Vanquish Charger Operating Manual ...
Page 66: ...7 Maintenance Page 66 Vanquish Charger Operating Manual ...
Page 76: ...9 Specifications Page 76 Vanquish Charger Operating Manual ...
Page 80: ...10 Accessories Consumables and Replacement Parts Page 80 Vanquish Charger Operating Manual ...
Page 85: ...12 Index Vanquish Charger Operating Manual Page 85 12 Index ...