Chapter 9
Adjust a Quartz Wool Packing
Maintaining a PTV Injector
Maintenance and Troubleshooting Manual
165
OPERATING SEQUENCE
Adjust a Quartz Wool Packing
Materials needed
•
Screwdriver (P/N 205 026 03)
•
Graphite seal (P/N 290 134 17)
•
Non metallic sharp tool
•
Thin (<2 mm diameter) non metallic bar (e.g. 1.6 mm PEEK tube)
•
Septum (P/N 313 132 25)
•
Tweezers
WARNING! This operation must be carried out at low temperature to avoid burns. Therefore,
before beginning the sequence, the injector must be cooled to room temperature.
PRECAUTIONS
1. While in stand-by condition, press
OVEN
to
access the oven control table.
.
OVEN
Temp
50
50 <
Initial time
5
Ramp 1
10.0
2. Scroll to
Temp
and press
OFF
.
3. Press
RIGHT INLET
.
RIGHT INLET (PTV)
Temp
50
50 <
Pressure
100
100
Mode
split
4. Scroll to
Temp
and press
OFF
.