9
Adding Modules
Adding a PDD Module
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
463
Figure 485.
Pulse Generator Installation
b. Fix the pulse generator using the four barrel nuts provided. Tighten the nuts using a
T30 Torxhead screwdriver.
Plumbing the Gas Lines
shows the diagram of the gas lines connections of the detector system.
Figure 486.
Gas Line Connections
Before connecting the gas lines verify that:
Base Holes
Pulse
Generator
Rivets
Barrel Nut