CE-EMC Protection Installation Procedure
AC Power Supply Replacement
Thermo Fisher Scientific
LevelPRO Installation Guide
E-5
If this is an AC kit, it will include a new AC power supply that must be
installed on the detector. To do this:
1.
Remove the detector assembly from the housing, unplug the cable at
the bottom of the PCB going to the CPU board and remove the four
screws holding the power supply to the detector chassis (shown in
Figure E–5).
2.
Install the new power supply (p/n 886783) onto the detector chassis,
using the four screws removed earlier (shown in Figure E–6).
3.
Install the detector back into the housing.
Figure E–5. (left) & Figure E–6. (right)
AC Power
Supply
Replacement
Summary of Contents for LevelPRO Series
Page 2: ......
Page 3: ...LevelPRO Continuous Gamma Level System Installation Guide P N 717760 Revision H ...
Page 4: ......
Page 6: ...This page intentionally left blank ...
Page 8: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 28: ...This page intentionally left blank ...
Page 40: ...This page intentionally left blank ...
Page 48: ...This page intentionally left blank ...
Page 96: ...This page intentionally left blank ...
Page 106: ...This page intentionally left blank ...