Thermo Scientific
MS/ETD System Getting Started Guide
25
4
Daily Operation
To prepare the LTQ XL/ETD or LTQ Velos/ETD system for daily operation, follow these
procedures.
Before Operating the LTQ XL/ETD or LTQ Velos/ETD System
Follow these procedures every day before beginning the first analysis:
•
•
•
Checking the System Mode
Before beginning your daily work, turn on the mass spectrometer.
To turn on the mass spectrometer
1. Open the Tune Plus window; see the instructions on
2. Click the
On/Off/Standby
button to select the
On
mode.
When clicked, this button cycles through the power modes shown in the left margin.
•
Before Operating the LTQ XL/ETD or LTQ Velos/ETD System
•
Turning On the Reagent Ion Source
•
On
Off
Standby