5 • Service
Doc. 031857-03 4/06
5-83
5.21.2 Removing the CR-TC and Reinstalling it in the New EGC
Holder
1. Turn the holder upside down to view the CR-TC.
2. Grasp the top of the CR-
TC and lift up to
disconnect it from the
holder.
3. Disconnect the liquid
lines from the four ports
on the CR-TC (see
Figure 5-71. Disconnecting CR-TC Liquid Lines
4. Turn the new holder
upside down (see
connect the liquid lines
to the CR-TC.
NOTE To help retain the
fittings and ferrules
on the lines, remove
the coupler from
each line just before
connecting the line
to a port.
Figure 5-72. EGC Holder (upside down)
Disconnect liquid
lines from 4 ports
Couplers
Metal stud for mounting the CR-TC
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...