B • Installation
This chapter provides instructions for the initial installation of the Dionex AS-
DV.
NOTE The order of the steps is important. It is especially
important to install the Chromeleon Chromatography
Data System before connecting the USB cable and
turning on the system power.
B.1 Facility Requirements
•
Make sure the Dionex AS-DV installation site meets the electrical and
environmental specifications listed in
•
Refer to the dimension specifications in
to determine the amount
of bench space required. For optimum operation, place the Dionex AS-DV
close as possible to the left side of the IC system.
•
Allow at least 38 cm (15 in) of free space behind the Dionex AS-DV for
connections and ventilation.
•
Be sure that there is sufficient clearance above the Dionex AS-DVto allow the
top cover to be opened or removed.
B.2 Unpacking the Dionex AS-DV
1. Open the Dionex AS-DV shipping container. Remove the autosampler and
place it on the workbench.
2. Unpack the Dionex AS-DV Ship Kit (for 0.5 mL vials, P/N AAA-071115; for
5.0 mL vials, P/N 068887) and all other items included in the shipping
container. Place the items in a convenient location and check them against the
packing list. Report any discrepancies to Thermo Fisher Scientific
immediately.
Summary of Contents for Dionex AS-DV
Page 1: ...Dionex AS DV Autosampler Operator s Manual Document No 065259 Revision 05 October 2012 ...
Page 8: ...Dionex AS DV Operator s Manual vi Doc 065259 05 10 12 ...
Page 30: ...Dionex AS DV Operator s Manual 22 Doc 065259 05 10 12 ...
Page 132: ...Dionex AS DV Operator s Manual Index 6 Doc 065259 05 10 12 ...