2
Installation
Installing the LightPipe Flow Cell
20
Accela UV/Vis Detector Hardware Manual
Thermo Scientific
b. Screw the thumbscrew onto the retaining bar (see
Figure 24.
Thumbscrew securing the retaining bar to the retaining block
c.
Push the retaining block firmly against the flow cell and tighten the thumbscrew
fingertight.
7. Using the 3/32 in. ball-end hex screwdriver (supplied), screw in and tighten the two
photodiode assembly mounting screws (see
8. Reinstall the flow cell cover as follows:
a. Guide the tubing through the slots in the top and bottom of the flow cell
compartment cover (see
Figure 25.
Tubing slots in the flow cell compartment cover
IMPORTANT
To ensure optimum performance, do not acquire data with the UV/Vis
detector without replacing the LightPipe cover. The LightPipe cover minimizes
thermal fluctuations.
Thumbscrew
Outlet tubing
Inlet tubing
Flow cell cover
retaining screw
Summary of Contents for Accela UV/Vis Plus
Page 1: ...Thermo Accela UV Vis Plus Detector Hardware Manual 60257 97005 Revision C December 2013 ...
Page 16: ......
Page 54: ......
Page 86: ......