Servicing
DMC PMT Cooler and Reaction Chamber Replacement
Thermo Scientific
42iQD Instruction Manual
7-31
Figure 7–35.
Photo Reaction Chamber Cleaning, Hardware
6.
Pull reaction chamber outwards.
Equipment Damage
Some internal components can be damaged by small
amounts of static electricity. A properly grounded antistatic wrist strap
must be worn while handling an internal component.
▲
7.
To reinstall reaction chamber, follow previous steps in reverse, making
sure to back fill the cooler with dry air or nitrogen prior to installing
reaction chamber.
8.
Reinstall the measurement bench. Refer to
Summary of Contents for 42iQD
Page 1: ...42iQD Instruction Manual NOx Analyzer 119013 00 1Sep2021 ...
Page 2: ......
Page 32: ...Operation Instrument Display 3 8 42iQD Instruction Manual Thermo Scientific ...
Page 184: ......
Page 238: ......
Page 272: ......
Page 284: ......
Page 285: ......