All installations and services must be performed by qualified personnel.
Figure B
11. Make appropriate liquid and suction line connections to coil and braze connections.
NOTE: A wet rag makes an excellent heat sink for tubing and grommets.
:
If drilling or screwing into panel of plate is necessary, make certain drill does not penetrate
into any part of evaporator coil or hot water coil to avoid personal injury and/or property damage.
13. Position grommet panel on bottom door surface and secure in place with screws. Refer to Figure B.
14. Make appropriate condensate drain connections and seal the access opening.
INSTALLATION OF THE HOT WATER COIL:
1. Remove top door of air handler.
2. Slide hot water coil's side hanger brackets into coil channel(retaining channel) in the air handler. See
Figure C.
3. Push coil into unit until the coil is stopped by the back casing.
4. Cut out appropriate holes in insulation, realign top door and secure into place.
5. Make appropriate hydronic connections to inlet(blower side) and outlet(duct side) of coil and braze
into place.
6. Seal connections through panel with duct sealer or equivalent.