Section 6 – SR-2 Service Procedure A48A
Removal and Replacement
1. Turn the unit off.
2. Disconnect the unit battery.
3. Disconnect the standby power.
4. Disconnect the three wires from the phase detect module at the motor contactor.
5. Unplug the phase detect module harness.
6. Remove the old phase detect module.
7. Install the new phase detect module.
8. Connect the new phase detect module wires to the upper contactor as follows:
9. Connect the brown wire to L1 on the contactor.
10. Connect the blue wire to L2 on the contactor.
11. Connect the black wire to L3 on the contactor.
12. Use crimp-on terminals as required.
13. Connect the plug on the short harness from the phase detect module.
14. Install the high voltage cover.
15. Secure wires and wire harnesses as required using cable ties.
16. Connect the unit battery.
17. Connect standby power.
18. Perform a Pretrip Test to verify proper operation.
Page 4
P41RA48A 30 January 2005
Summary of Contents for SR-2 SmartReefer2
Page 4: ......
Page 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Page 8: ......
Page 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Page 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Page 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Page 16: ......
Page 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Page 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Page 50: ......
Page 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Page 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Page 98: ......
Page 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Page 182: ......
Page 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Page 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Page 268: ......
Page 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Page 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Page 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Page 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Page 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Page 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Page 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Page 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Page 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Page 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Page 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Page 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Page 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Page 408: ......
Page 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Page 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Page 420: ......
Page 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Page 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Page 425: ...8 5...
Page 426: ...8 6...
Page 427: ...8 7...
Page 428: ...8 8...
Page 429: ...8 9...
Page 430: ...8 10...
Page 431: ...8 11...