S–750i Unit Check List
U
UN
NIIT
T C
CH
HE
EC
CK
K L
LIIS
ST
T
☐
BEFORE installing the unit, visually inspect it for any damage. If any damage appears, file claim with delivery carrier.
☐
Install the fuel tank, fuel lines and unit as outlined in the Thermo King Installation Manual.
☐
Add 20 gallons (minimum) of ultra-low sulfur diesel fuel to the tank.
B
BE
EF
FO
OR
RE
E S
ST
TA
AR
RT
TIIN
NG
G T
TH
HE
E U
UN
NIIT
T
☐
Check battery and battery cable installation.
☐
Inspect fuel line routing checking for rubbing, chaffing or laying on hot surfaces.
☐
Visually inspect the unit for the following: Loose or improperly fitting bolts, brackets, hardware, hose connections,
and hose routing.
☐
Inspect all wiring connections and routing.
☐
Check defrost drain hoses and kazoos.
☐
Check unit mounting hardware for tightness.
☐
Check compressor and engine mounts.
☐
Check engine oil level.
☐
Check condenser and evaporator section for cleanliness and signs of refrigerant leaks.
☐
Check front bulkhead and air chute if equipped.
S
ST
TA
AR
RT
T A
AN
ND
D R
RU
UN
N U
UN
NIIT
T
☐
Check for proper oil pressure, coolant temperature, oil, fuel, or coolant leaks.
☐
Check alternator or battery charger for proper output.
☐
Cycle the unit and ensure the unit functions in the correct modes and the mode indicators are working.
☐
Confirm engine speeds at normal engine running temperature. High Speed and Low Speed per maintenance
manual. Check @70° F (21 C) box temperature and 70° F (21 C) ambient.
☐
Set for continuous run with thermostat set point at 32 F (0 C) and run the unit to 32 F (0 C).
☐
Observe and record refrigerant operating pressures in relation to ambient and box temperatures.
☐
Verify the readings above are correct for the conditions.
☐
When box reaches 32 F (0 C) check calibration of thermostat, thermometer and data logger.
☐
Run unit for 30 minutes at 32 F (0 C). During this period check for correct cycling.
☐
Reset thermostat to 50 F (10 C).
☐
Check throttling valve while in the heat cycle.
☐
Check operation of Modulation system if equipped.
☐
Perform a controlled check of the refrigerant level.
☐
Initiate and check defrost operation and termination.
☐
Check for proper operation of all door switches.
☐
Remove the compartment bulk head(s) if equipped.
☐
Verify fuel level is sufficient to run unit for 6 hours, close trailer doors and initiate engine break-in mode. (more
engine break-in mode information can be found in the Diagnostic Manual).
To enter engine break-in mode: Menu>Maintenance Menu>Engine Break-in Mode>Select>Start. Engine will run for
6 hours to complete engine break-in.
☐
Run Pre-trip.
E
EL
LE
EC
CT
TR
RIIC
C S
ST
TA
AN
ND
DB
BY
Y O
OP
PE
ER
RA
AT
TIIO
ON
NA
AL
L C
CH
HE
EC
CK
KS
S
☐
Test AC electrical contacts and connections by connecting to AC power and running unit.
☐
Cycle thermostat and check for correct modes of operation.
☐
Power source not available to test AC.