background image

 

 

 

       

Installation: 

 

 

 

 
 

 
 

 
 

 

 
 

 
 

 

 
 

 
 
 

 
 

 
 

 

 
 

 
 

 
 

 

 
 

 
 

 

 
 
 
 

 

 
 

 

 
 

 
 

 

 
 

 
 

 

 
 

 
 
 

 
 

 
 

 

 
 

 
 

 
 

 

 
 

 
 

 

 
 

 
 

 

 
 

 

1. The heater should be installed by a qualified 

plumber. We recommend the use of a knee pad 
when installing this product. Cut the opening in 
the plinth to the size shown in the table. Use 

method A or B.

 

 

Model 

Width A  Height 

B* 

KPH 

1300/1500/1800/2100 

462mm 

97mm 

* The overall height of the grille is 100mm. Use 

care when cutting the opening. 

 

 

 

 

A

A

B

B

 

2. Fit isolating valves (not supplied) to the 
system flow and return pipes. Failure to fit 
isolating valves may mean that the 

product is not serviceable in the event of 
failure. Remove and discard the two 
protection bungs in the copper pipes and 
connect the flexible hoses between 

system pipework and heater. Open the 
isolating valves and check for leaks. 

 

N.B. either pipe may be used on flow or return. 

 

3. Vent air through bleed screw if 
necessary. 

 Flate heat 
screw driver

Bleed Valve

I

O

II

 

4.

 

Isolate electrical supply and 

connect the heater electric cable to 
the fused spur (3A). Ensure the 

fused spur is not directly above the 
heater and is accessible after 
installation is complete. Electrical 

works should be carried out by a 
qualified electrician, in compliance 
with local regulations.   

 

I

O

II

Fused Spur

 

Flow 

Return 

Summary of Contents for KPH 1300-B

Page 1: ...m from the top of the unit to the any shelving This unit must be installed of flat surface to avoid vibration Isolating valves not supplied should be fitted to both pipes flow return to allow easy servicing The flexible hose should be fitted to both pipe flow return to allow easy servicing This unit should not be installed in bath room or high humid areas Electrical connections should be via 3A fu...

Page 2: ...oduct is not serviceable in the event of failure Remove and discard the two protection bungs in the copper pipes and connect the flexible hoses between system pipework and heater Open the isolating valves and check for leaks N B either pipe may be used on flow or return 3 Vent air through bleed screw if necessary Flate heat screw driver Bleed Valve I O II 4 Isolate electrical supply and connect th...

Page 3: ...the power supply is switched ON b Check fuse in fused spur c Check the wiring connections at the fused spur 2 No heat output on settings l and ll a Check the power supply is switched ON b If fitted ensure any room thermostats are calling for heat c Balance the central heating system if installed on same circuit as panel radiators and increase the circulating pump speed if required d Increase the b...

Page 4: ...ility capable of handling these products and their waste by products If you are purchasing replacement equipment your retailer may offer a take back scheme or will be able to give details of the nearest approved authorised treatment facility Proper recycling and waste disposal will help conserve resources whilst preventing detrimental effects on our health and the environment This product is cover...

Reviews: