6
ENGLISH
INSTALLATION
INSTALLATION
UNPACKING THE PRODUCT
Heaters
T
TBSS
are supplied in a single package
on a wooden pallet.
The insulation and the lining components of the models 800
and 1000 are supplied separately from the structural work and
are to be assembled upon receiving the product as described
in the paragraph "Assembly of the insulation and the lining
(models 800 - 1000)". For these models the magnesium anode
is supplied in a cardboard box.
The following items are delivered in a plastic bag inside the
packaging:
- Instruction manual
- Bar code label
- Hydraulic test certificate
- Energy label (to be applied to device upon installation)
- No. 4 adjustable feet to be mounted during installation
(for models 800-1000 only).
b
The instruction manual is an integral part of the solar stor-
age cylinder. Once located, read it thoroughly and keep
it safe.
b
For handling operations, thoroughly follow the instruc-
tions on device package label.
ASSEMBLY OF THE INSULATION AND
THE LINING (MODELS 800 - 1000)
The assembly of the insulation and lining components must
be performed at the site of installation to facilitate passage
through any doors and/or entries to the room.
4
5
2
1
7
3
3
1
6
1
3
L
3
L
Proceed as follows:
- Fit the magnesium anode (6) with its seal in the sleeve
and fix it in place
- Assemble the insulating covers (1) around the body of
the heater, making sure that the engagement points on
the edges are positioned correctly. The edges are not
required to be closed completely
- Place the front protection plate (3) correctly on the at-
tachments
- Place the washers on the attachments and the protec-
tion for the inspection flange (4)
- Place the rear protection plate by closing the interlock-
ing flaps (L) without closing completely (leave one tooth
open)
- Apply the upper insulation (2) and the upper cover (5)
(in order to insert the cover, exert a light and homoge-
neous pressure)
- Close the interlocking flaps (L) completely, which were
previously left with an open tooth
- Fit the cover of the inspection flange using the two
self-tapping screws (7) provided
- Apply the technical data plate and serial number plate.
If disassembling is required, proceed in reverse order.
b
Wear suitable personal protective equipment and use
suitable safety devices.
PLACE OF INSTALLATION
T
TBSS
storage cylinders can be installed in any
room where there is no specific requirement for an electrical
protection rating higher than IP X0D.
≥ 0,3 m
≥ 0,3 m
≥ 0,3 m
≥ 0,6 m
≥ 0,7 m
NOTE:
the above-indicated dimensions are recommended for
a correct maintenance and access to the device.
INSTALLATION IN OLDER SYSTEMS AND
SYSTEMS REQUIRING MODERNISATION
When installing
T
TBSS
storage cylinders in old
systems or systems requiring modernisation, always perform
the following checks.
- Make sure that the system is fitted with safety and con-
trol devices in accordance with applicable legislation
and standards
- Make sure that the central heating circuit has been
flushed out to remove all sludge and lime scale, and
has been vented and seal tested
- Make sure that a suitable water treatment system is in-
stalled if the quality of the supply/recirculation water so
demands. (Refer to the reference values listed in the
table alongside.)
WATER QUALITY REQUIREMENTS
REFERENCE VALUES
pH
6-8
Electrical conductivity
less than 200 μS/cm (25°C)
Chlorine ions
less than 50 ppm
Sulphuric acid ions
less than 50 ppm
Total iron
less than 0.3 ppm
Alkalinity M
less than 50 ppm
Total hardness
less than 35°F
Sulphur ions
none
Ammonia ions
none
Silicon ions
less than 30 ppm
The values above ensure proper operation of the system. Refer
to the limit values specified in the current standards and regu-
lations on the installation site.
Installation